Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2004 |
Principal Product | Variable Transformers / UPS |
NAICS | 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3677 - Electronic Coils And Transformers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 121,887 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $32,676 | 967,061 | kWh | $0.03 |
Electricity Demand | $44,181 | 3,516 | kW-months/year | $12.57 |
Natural Gas | $22,780 | 2,907 | MMBtu | $7.84 |
Fuel Oil #2 | $40,185 | 5,885 | MMBtu | $6.83 |
TOTAL ENERGY COSTS | $141,872 | |||
RECOMMENDED SAVINGS* | $98,417 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,670 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $42,439 Cost: - |
$9,405 | 300,000 | $55,692 | 4,200 | $2,916 | 372 | $(-25,574) | (-3,703) | - | - | - | - | - | - | - | - | - | - |
$9,405 300,000 kWh |
$55,692 4,200 kW-months/year |
$2,916 372 MMBtu |
$(-25,574) (-3,703) MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $14,454 Cost: $20,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $9,204 | - | $5,250 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
$9,204 - $ |
$5,250 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $7,720 Cost: - |
- | - | - | - | $7,720 | 985 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,720 985 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $7,076 Cost: $9 |
$1,984 | 64,000 | $5,092 | 384 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$1,984 64,000 kWh |
$5,092 384 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $7,056 Cost: - |
- | - | - | - | $7,056 | 900 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,056 900 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.731 ADVERTISE PRODUCT OR SERVICE |
Savings: $7,000 Cost: $(-40,240) |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $7,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$7,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,434 Cost: - |
- | - | - | - | $3,434 | 438 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,434 438 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $2,564 Cost: - |
- | - | - | - | $2,564 | 327 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,564 327 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN |
Savings: $2,331 Cost: $175 |
$50 | 1,563 | - | - | $2,281 | 291 | - | - | - | - | - | - | - | - | - | - | - | - |
$50 1,563 kWh |
- - kW-months/year |
$2,281 291 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,110 Cost: - |
- | - | - | - | - | - | - | - | - | - | $1,200 | - | $(-390) | - | - | - | $300 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$1,200 - lb |
$(-390) - $ |
- - $ |
$300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $784 Cost: - |
- | - | - | - | $784 | 100 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$784 100 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $729 Cost: - |
- | - | - | - | $729 | 93 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$729 93 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $397 Cost: $756 |
$130 | 4,200 | $267 | 20 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$130 4,200 kWh |
$267 20 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $420 Cost: $340 |
- | - | - | - | - | - | - | - | $420 | 2,798 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$420 2,798 Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $339 Cost: - |
$339 | 3,355 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$339 3,355 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7122 DISCONNECT BALLASTS |
Savings: $327 Cost: $7 |
$107 | 3,450 | $220 | 17 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$107 3,450 kWh |
$220 17 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $237 Cost: $213 |
$78 | 2,500 | $159 | 12 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$78 2,500 kWh |
$159 12 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,417 Cost: $(-18,740) |
$12,093 | 379,068 | $61,430 | 4,633 | $27,484 | 3,506 | $(-25,574) | (-3,703) | $420 | 2,798 | $1,200 | - | $8,814 | - | $12,250 | - | $300 | - | $12,093 379,068 kWh |
$61,430 4,633 kW-months/year |
$27,484 3,506 MMBtu |
$(-25,574) (-3,703) MMBtu |
$420 2,798 Tgal |
$1,200 - lb |
$8,814 - $ |
$12,250 - $ |
$300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,670 Cost: $(-39,080) |
$2,688 | 79,068 | $5,738 | 433 | $21,134 | 2,696 | - | - | - | - | $1,200 | - | $(-390) | - | $7,000 | - | $300 | - | $2,688 79,068 kWh |
$5,738 433 kW-months/year |
$21,134 2,696 MMBtu |
- - MMBtu |
- - Tgal |
$1,200 - lb |
$(-390) - $ |
$7,000 - $ |
$300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production |