IAC logo
IAC Assessment: UD0696
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0696
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Aluminum Castings
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 30,000
Annual Production 2,300,000 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,557 1,587,937 kWh $0.03
Electricity Demand $51,867 4,284 kW-months/year $12.11
Natural Gas $296,256 40,284 MMBtu $7.35
TOTAL ENERGY COSTS $399,257
RECOMMENDED SAVINGS* $114,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,359
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$50,850
Cost:
$28,500
- - - - - - $50,850 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$50,850
-
$
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$19,683
Cost:
$2,870
- - - - $19,683 2,678 - - - - -
-
kWh
-
-
kW-months/year
$19,683
2,678
MMBtu
-
-
$
-
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$11,250
Cost:
-
- - - - - - $11,250 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,250
-
$
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$9,375
Cost:
-
- - - - - - $9,375 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,375
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,026
Cost:
$2,405
- - - - $9,026 1,228 - - - - -
-
kWh
-
-
kW-months/year
$9,026
1,228
MMBtu
-
-
$
-
-
$
06: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$6,615
Cost:
$13,230
- - - - $6,615 900 - - - - -
-
kWh
-
-
kW-months/year
$6,615
900
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,891
Cost:
$600
$756 36,000 $1,135 72 - - - - - - $756
36,000
kWh
$1,135
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$1,617
Cost:
-
- - - - $1,617 220 - - - - -
-
kWh
-
-
kW-months/year
$1,617
220
MMBtu
-
-
$
-
-
$
09: 2.7122 DISCONNECT BALLASTS Savings:
$1,218
Cost:
$53
$609 19,320 $609 36 - - - - - - $609
19,320
kWh
$609
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$845
Cost:
-
- - - - $845 115 - - - - -
-
kWh
-
-
kW-months/year
$845
115
MMBtu
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$631
Cost:
$486
$252 12,000 $379 24 - - - - - - $252
12,000
kWh
$379
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.7314 REDUCE VENTILATION AIR Savings:
$1,416
Cost:
-
- - - - - - - - $1,416 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,416
-
$
TOTAL RECOMMENDED Savings:
$114,417
Cost:
$48,144
$1,617 67,320 $2,123 132 $37,786 5,141 $71,475 - $1,416 - $1,617
67,320
kWh
$2,123
132
kW-months/year
$37,786
5,141
MMBtu
$71,475
-
$
$1,416
-
$
TOTAL IMPLEMENTED Savings:
$14,359
Cost:
$1,086
$1,008 48,000 $1,514 96 $2,462 335 $9,375 - - - $1,008
48,000
kWh
$1,514
96
kW-months/year
$2,462
335
MMBtu
$9,375
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes