IAC logo
IAC Assessment: UD0700
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0700
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Concrete accessories
NAICS 331222 - Steel Wire Drawing
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 133,485
Annual Production 3,024,000 Pieces
Production Hrs. Annual 5,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,651 2,911,200 kWh $0.03
Electricity Demand $111,729 8,484 kW-months/year $13.17
Natural Gas $127,272 14,968 MMBtu $8.50
TOTAL ENERGY COSTS $330,582
RECOMMENDED SAVINGS* $779,072 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$454,279
Cost:
$226,320
$(-29,161) (-1,080,000) - - $53,440 6,287 $30,000 - $400,000 - $(-29,161)
(-1,080,000)
kWh
-
-
kW-months/year
$53,440
6,287
MMBtu
$30,000
-
$
$400,000
-
$
02: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$256,000
Cost:
$538,944
- - - - - - $256,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$256,000
-
$
-
-
$
03: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$35,000
Cost:
-
- - - - - - $35,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$35,000
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,353
Cost:
$82,536
$5,670 210,000 $6,683 492 - - - - - - $5,670
210,000
kWh
$6,683
492
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,176
Cost:
$1,380
$2,835 105,000 $3,341 252 - - - - - - $2,835
105,000
kWh
$3,341
252
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,941
Cost:
-
$1,350 50,000 $1,591 120 - - - - - - $1,350
50,000
kWh
$1,591
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,656
Cost:
$3,000
$2,656 45,000 - - - - - - - - $2,656
45,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$2,312
Cost:
$8,302
$1,198 44,000 $1,114 84 - - - - - - $1,198
44,000
kWh
$1,114
84
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,471
Cost:
$4,116
$796 25,000 $675 60 - - - - - - $796
25,000
kWh
$675
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,258
Cost:
$1,405
$1,258 18,225 - - - - - - - - $1,258
18,225
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,104
Cost:
$700
$547 20,250 $557 42 - - - - - - $547
20,250
kWh
$557
42
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$850
Cost:
$328
- - - - $850 100 - - - - -
-
kWh
-
-
kW-months/year
$850
100
MMBtu
-
-
$
-
-
$
13: 2.5123 REDUCE FLUID FLOW RATES Savings:
$774
Cost:
$850
$774 11,220 - - - - - - - - $774
11,220
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
14: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$706
Cost:
$243
$324 12,000 $382 29 - - - - - - $324
12,000
kWh
$382
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
15: 2.2511 INSULATE BARE EQUIPMENT Savings:
$604
Cost:
$1,575
- - - - $604 71 - - - - -
-
kWh
-
-
kW-months/year
$604
71
MMBtu
-
-
$
-
-
$
16: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$588
Cost:
$500
$270 10,000 $318 24 - - - - - - $270
10,000
kWh
$318
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$779,072
Cost:
$870,199
$(-11,483) (-529,305) $14,661 1,103 $54,894 6,458 $321,000 - $400,000 - $(-11,483)
(-529,305)
kWh
$14,661
1,103
kW-months/year
$54,894
6,458
MMBtu
$321,000
-
$
$400,000
-
$
TOTAL IMPLEMENTED Savings:
$12,941
Cost:
$83,036
$5,940 220,000 $7,001 516 - - - - - - $5,940
220,000
kWh
$7,001
516
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product