IAC logo
IAC Assessment: UD0706
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0706
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Commercial food equipment
NAICS 333241 - Food Product Machinery Manufacturing
SIC 3556 - Food Products Machinery
Sales $50,000,000-$100,000,000
# of Employees 244
Plant Area (Sq.Ft.) 134,475
Annual Production 8,670 Pieces
Production Hrs. Annual 2,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $203,207 3,372,496 kWh $0.06
Natural Gas $65,787 7,244 MMBtu $9.08
TOTAL ENERGY COSTS $275,699
RECOMMENDED SAVINGS* $197,999 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$144,536
Cost:
$30,000
- - - - - - - - - - $144,536 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$144,536
-
$
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$18,275
Cost:
$40,280
- - - - $2,600 230 $16,000 - $(-325) - - - -
-
kWh
-
-
kW-months/year
$2,600
230
MMBtu
$16,000
-
$
$(-325)
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,881
Cost:
$6,152
$3,459 136,500 $9,422 728 - - - - - - - - $3,459
136,500
kWh
$9,422
728
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,779
Cost:
$570
$2,643 101,688 $5,136 396 - - - - - - - - $2,643
101,688
kWh
$5,136
396
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$5,291
Cost:
$1,000
- - - - - - $5,291 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,291
-
$
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,549
Cost:
$500
- - - - $3,549 393 - - - - - - -
-
kWh
-
-
kW-months/year
$3,549
393
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,205
Cost:
$2,106
$730 28,080 $1,475 112 - - - - - - - - $730
28,080
kWh
$1,475
112
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,883
Cost:
$3,883
- - - - $1,883 203 - - - - - - -
-
kWh
-
-
kW-months/year
$1,883
203
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,558
Cost:
-
$624 24,000 $934 72 - - - - - - - - $624
24,000
kWh
$934
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$42
Cost:
-
- - - - - - $42 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$42
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$197,999
Cost:
$84,491
$7,456 290,268 $16,967 1,308 $8,032 826 $21,333 - $(-325) - $144,536 - $7,456
290,268
kWh
$16,967
1,308
kW-months/year
$8,032
826
MMBtu
$21,333
-
$
$(-325)
-
$
$144,536
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product