IAC logo
IAC Assessment: UD0709
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0709
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2005
Principal Product Asphalt Products
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 435,600
Annual Production 12,000 Thousand Gallons
Production Hrs. Annual 3,432
Location (State) Oh
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,260 907,734 kWh $0.07
Electricity Demand $56,254 4,968 kW-months/year $11.32
Natural Gas $378,070 59,980 MMBtu $6.30
TOTAL ENERGY COSTS $514,283
RECOMMENDED SAVINGS* $60,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,506
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,133
Cost:
-
- - $12,744 2,124 - - - - - - $4,389 - -
-
kWh
$12,744
2,124
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$4,389
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,549
Cost:
$34,600
- - - - $13,549 1,826 - - - - - - -
-
kWh
-
-
kW-months/year
$13,549
1,826
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$13,847
Cost:
$40,000
$(-1,124) (-21,875) $(-3,038) (-300) - - $300 23 $17,709 - - - $(-1,124)
(-21,875)
kWh
$(-3,038)
(-300)
kW-months/year
-
-
MMBtu
$300
23
MMBtu
$17,709
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,529
Cost:
-
- - - - $10,529 1,419 - - - - - - -
-
kWh
-
-
kW-months/year
$10,529
1,419
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,977
Cost:
$4,500
- - - - $3,977 536 - - - - - - -
-
kWh
-
-
kW-months/year
$3,977
536
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,708
Cost:
$3,213
$1,270 24,710 $438 4 - - - - - - - - $1,270
24,710
kWh
$438
4
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,743
Cost:
$82,313
$146 2,835 $10,144 1,828 $28,055 3,781 $300 23 $17,709 - $4,389 - $146
2,835
kWh
$10,144
1,828
kW-months/year
$28,055
3,781
MMBtu
$300
23
MMBtu
$17,709
-
$
$4,389
-
$
TOTAL IMPLEMENTED Savings:
$14,506
Cost:
$4,500
- - - - $14,506 1,955 - - - - - - -
-
kWh
-
-
kW-months/year
$14,506
1,955
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes