IAC logo
IAC Assessment: UD0714
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0714
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2005
Principal Product Powder coating and electro-coating for metal castings
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 44,000
Annual Production 400,000 Pieces
Production Hrs. Annual 2,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,757 947,080 kWh $0.03
Electricity Demand $45,434 3,552 kW-months/year $12.79
Natural Gas $120,029 12,967 MMBtu $9.26
TOTAL ENERGY COSTS $205,398
RECOMMENDED SAVINGS* $67,024 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,348
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$14,094
Cost:
$5,000
- - - - - - - - - - $14,094 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$14,094
-
$
-
-
$
02: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$13,500
Cost:
$10,000
- - - - - - - - - - $13,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$13,500
-
$
-
-
$
03: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$12,150
Cost:
$1,000
- - - - - - - - - - $12,150 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$12,150
-
$
-
-
$
04: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$6,825
Cost:
$3,000
- - - - $6,825 737 - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,825
737
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,482
Cost:
$2,000
$4,482 54,662 - - - - - - - - - - - - $4,482
54,662
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,427
Cost:
$14,204
$961 31,000 $2,466 186 - - - - - - - - - - $961
31,000
kWh
$2,466
186
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$2,772
Cost:
$165
- - - - - - - - - - $2,772 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$2,772
-
$
-
-
$
08: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$1,972
Cost:
$150
- - - - $1,972 213 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,972
213
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$1,311
Cost:
$1,200
- - - - - - $1,311 216,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,311
216,000
Tgal
-
-
gal
-
-
$
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,296
Cost:
-
- - - - $1,296 140 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,296
140
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
11: 3.4151 MINIMIZE WATER USAGE Savings:
$1,138
Cost:
$350
- - - - - - $787 129,600 $351 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$787
129,600
Tgal
$351
-
gal
-
-
$
-
-
$
12: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$1,000
Cost:
$4,000
- - - - - - - - - - - - $1,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$1,000
-
$
13: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$928
Cost:
$200
$260 8,400 $668 50 - - - - - - - - - - $260
8,400
kWh
$668
50
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
14: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$884
Cost:
$330
$248 8,000 $636 48 - - - - - - - - - - $248
8,000
kWh
$636
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
15: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$884
Cost:
-
$248 8,000 $636 48 - - - - - - - - - - $248
8,000
kWh
$636
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
16: 2.2511 INSULATE BARE EQUIPMENT Savings:
$361
Cost:
$650
- - - - $361 39 - - - - - - - - -
-
kWh
-
-
kW-months/year
$361
39
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$67,024
Cost:
$42,249
$6,199 110,062 $4,406 332 $10,454 1,129 $2,098 345,600 $351 - $42,516 - $1,000 - $6,199
110,062
kWh
$4,406
332
kW-months/year
$10,454
1,129
MMBtu
$2,098
345,600
Tgal
$351
-
gal
$42,516
-
$
$1,000
-
$
TOTAL IMPLEMENTED Savings:
$28,348
Cost:
$5,865
$248 8,000 $636 48 $10,093 1,090 $2,098 345,600 $351 - $14,922 - - - $248
8,000
kWh
$636
48
kW-months/year
$10,093
1,090
MMBtu
$2,098
345,600
Tgal
$351
-
gal
$14,922
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product