IAC Assessment: UD0750
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0750
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2006
Principal Product Lubricant Additives
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $100,000,000-$500,000,000
# of Employees 240
Plant Area (Sq.Ft.) 3,397,680
Annual Production 174,000 Tons
Production Hrs. Annual 8,736
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,692,620 28,679,842 kWh $0.06
Natural Gas $6,796,310 609,330 MMBtu $11.15
TOTAL ENERGY COSTS $8,763,260
RECOMMENDED SAVINGS* $946,251 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $528,890
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$273,386
Cost:
$100,000
- - $273,386 24,519 - - -
-
kWh
$273,386
24,519
MMBtu
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$226,890
Cost:
$120,000
$226,890 3,845,640 - - - - $226,890
3,845,640
kWh
-
-
MMBtu
-
-
Tgal
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$155,000
Cost:
$187,200
- - $150,000 13,104 $5,000 1,214,304 -
-
kWh
$150,000
13,104
MMBtu
$5,000
1,214,304
Tgal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$79,000
Cost:
$45,000
- - $79,000 9,900 - - -
-
kWh
$79,000
9,900
MMBtu
-
-
Tgal
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$56,000
Cost:
-
- - $56,000 5,000 - - -
-
kWh
$56,000
5,000
MMBtu
-
-
Tgal
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$44,000
Cost:
$25,000
- - $35,000 3,494 $9,000 2,087,904 -
-
kWh
$35,000
3,494
MMBtu
$9,000
2,087,904
Tgal
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$41,225
Cost:
$39,892
- - $41,225 3,697 - - -
-
kWh
$41,225
3,697
MMBtu
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,020
Cost:
$135,999
$39,020 661,380 - - - - $39,020
661,380
kWh
-
-
MMBtu
-
-
Tgal
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$24,000
Cost:
$13,000
- - $23,000 1,747 $1,000 183,456 -
-
kWh
$23,000
1,747
MMBtu
$1,000
183,456
Tgal
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,730
Cost:
$20,000
$7,730 131,000 - - - - $7,730
131,000
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$946,251
Cost:
$686,091
$273,640 4,638,020 $657,611 61,461 $15,000 3,485,664 $273,640
4,638,020
kWh
$657,611
61,461
MMBtu
$15,000
3,485,664
Tgal
TOTAL IMPLEMENTED Savings:
$528,890
Cost:
$390,200
$226,890 3,845,640 $287,000 28,245 $15,000 3,485,664 $226,890
3,845,640
kWh
$287,000
28,245
MMBtu
$15,000
3,485,664
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal