IAC Assessment: UD0756
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0756
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2007
Principal Product Plastic Bottles
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3085 - Plastics Bottles
Sales $50,000,000-$100,000,000
# of Employees 97
Plant Area (Sq.Ft.) 200,000
Annual Production 417,343 Pieces
Production Hrs. Annual 8,568
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,021,202 45,712,800 kWh $0.04
Natural Gas $61,187 3,607 MMBtu $16.96
TOTAL ENERGY COSTS $2,151,896
RECOMMENDED SAVINGS* $415,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $270,285
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Fees Natural Gas Administrative Changes Primary Raw Material
$ kWh $ $ $ MMBtu $ $ $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$58,368
Cost:
-
- - $58,368 - - - - - - - -
-
kWh
$58,368
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$54,790
Cost:
-
$55,669 1,159,782 - - - - $(-879) - - - $55,669
1,159,782
kWh
-
-
$
-
-
MMBtu
$(-879)
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46,822
Cost:
$18,000
$46,822 975,467 - - - - - - - - $46,822
975,467
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$42,997
Cost:
$210,200
$12,085 251,778 - - - - $27,407 - $3,505 - $12,085
251,778
kWh
-
-
$
-
-
MMBtu
$27,407
-
$
$3,505
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$44,237
Cost:
$86,570
$41,824 871,333 - - - - $2,413 - - - $41,824
871,333
kWh
-
-
$
-
-
MMBtu
$2,413
-
$
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$30,653
Cost:
$5,000
- - - - - - $30,653 - - - -
-
kWh
-
-
$
-
-
MMBtu
$30,653
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,570
Cost:
-
$30,570 636,888 - - - - - - - - $30,570
636,888
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,516
Cost:
$30,000
$30,516 635,746 - - - - - - - - $30,516
635,746
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$26,847
Cost:
$15,750
$26,847 559,319 - - - - - - - - $26,847
559,319
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,180
Cost:
$12,000
$26,180 545,500 - - - - - - - - $26,180
545,500
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
11: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$13,900
Cost:
$15,000
- - - - $13,900 820 - - - - -
-
kWh
-
-
$
$13,900
820
MMBtu
-
-
$
-
-
$
12: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$4,769
Cost:
-
- - - - - - $4,769 - - - -
-
kWh
-
-
$
-
-
MMBtu
$4,769
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,160
Cost:
$4,680
$4,160 80,864 - - - - - - - - $4,160
80,864
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$306
Cost:
$150
$306 6,381 - - - - - - - - $306
6,381
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$415,115
Cost:
$397,350
$274,979 5,723,058 $58,368 - $13,900 820 $64,363 - $3,505 - $274,979
5,723,058
kWh
$58,368
-
$
$13,900
820
MMBtu
$64,363
-
$
$3,505
-
$
TOTAL IMPLEMENTED Savings:
$270,285
Cost:
$126,400
$174,961 3,639,327 $58,368 - - - $36,956 - - - $174,961
3,639,327
kWh
$58,368
-
$
-
-
MMBtu
$36,956
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Fees Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Fees Natural Gas Administrative Changes Primary Raw Material