IAC logo
IAC Assessment: UD0766
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0766
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2007
Principal Product aluminum extruded products
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $100,000,000-$500,000,000
# of Employees 240
Plant Area (Sq.Ft.) 1,140,170
Annual Production 200,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,134,482 46,206,000 kWh $0.05
Natural Gas $5,390,091 702,737 MMBtu $7.67
TOTAL ENERGY COSTS $7,524,573
RECOMMENDED SAVINGS* $2,533,946 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $193,242
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$832,000
Cost:
$400,000
- - - - $832,000 108,500 - - -
-
kWh
-
-
kW-months/year
$832,000
108,500
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$942,000
Cost:
$520,000
- - - - $942,000 122,900 - - -
-
kWh
-
-
kW-months/year
$942,000
122,900
MMBtu
-
-
$
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$306,000
Cost:
$20,000
- - - - $306,000 40,000 - - -
-
kWh
-
-
kW-months/year
$306,000
40,000
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$164,851
Cost:
$140,000
- - - - $164,851 21,493 - - -
-
kWh
-
-
kW-months/year
$164,851
21,493
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$78,420
Cost:
$279,770
$44,183 1,840,954 $30,529 256 - - $3,708 - $44,183
1,840,954
kWh
$30,529
256
kW-months/year
-
-
MMBtu
$3,708
-
$
06: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$57,000
Cost:
$30,000
- - - - $57,000 7,400 - - -
-
kWh
-
-
kW-months/year
$57,000
7,400
MMBtu
-
-
$
07: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$40,000
Cost:
$1,100
- - - - $40,000 5,200 - - -
-
kWh
-
-
kW-months/year
$40,000
5,200
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,800
Cost:
$20,000
$35,800 1,491,840 - - - - - - $35,800
1,491,840
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$26,203
Cost:
$10,000
- - - - $26,203 3,416 - - -
-
kWh
-
-
kW-months/year
$26,203
3,416
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,343
Cost:
$85,140
$16,231 676,305 $7,281 61 - - $831 - $16,231
676,305
kWh
$7,281
61
kW-months/year
-
-
MMBtu
$831
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,564
Cost:
$19,275
$7,430 309,600 $5,134 43 - - - - $7,430
309,600
kWh
$5,134
43
kW-months/year
-
-
MMBtu
-
-
$
12: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,135
Cost:
-
$3,628 151,200 $2,507 21 - - - - $3,628
151,200
kWh
$2,507
21
kW-months/year
-
-
MMBtu
-
-
$
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,806
Cost:
$6,000
$2,806 116,928 - - - - - - $2,806
116,928
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,115
Cost:
-
$1,279 53,280 $836 7 - - - - $1,279
53,280
kWh
$836
7
kW-months/year
-
-
MMBtu
-
-
$
15: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,068
Cost:
$2,130
$1,210 50,400 $858 7 - - - - $1,210
50,400
kWh
$858
7
kW-months/year
-
-
MMBtu
-
-
$
16: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,641
Cost:
$6,210
$1,641 68,377 - - - - - - $1,641
68,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$2,533,946
Cost:
$1,539,625
$114,208 4,758,884 $47,145 395 $2,368,054 308,909 $4,539 - $114,208
4,758,884
kWh
$47,145
395
kW-months/year
$2,368,054
308,909
MMBtu
$4,539
-
$
TOTAL IMPLEMENTED Savings:
$193,242
Cost:
$405,285
$104,923 4,371,979 $43,780 367 $40,000 5,200 $4,539 - $104,923
4,371,979
kWh
$43,780
367
kW-months/year
$40,000
5,200
MMBtu
$4,539
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes