IAC logo
IAC Assessment: UD0776
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0776
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2008
Principal Product Aluminum Sand Castings
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 218
Plant Area (Sq.Ft.) 165,000
Annual Production 2,600,000 Pieces
Production Hrs. Annual 7,200
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,406,906 18,936,000 kWh $0.07
Natural Gas $1,400,000 175,000 MMBtu $8.00
TOTAL ENERGY COSTS $2,841,991
RECOMMENDED SAVINGS* $352,859 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,149
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$65,320
Cost:
-
- - - - $65,320 9,165 - - -
-
kWh
-
-
kW-months/year
$65,320
9,165
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$48,929
Cost:
$1,000
$39,017 768,768 $9,912 88 - - - - $39,017
768,768
kWh
$9,912
88
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$47,472
Cost:
$6,525
- - - - $47,472 5,934 - - -
-
kWh
-
-
kW-months/year
$47,472
5,934
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,691
Cost:
-
$27,658 512,179 $10,030 71 - - $2,003 - $27,658
512,179
kWh
$10,030
71
kW-months/year
-
-
MMBtu
$2,003
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$38,304
Cost:
$20,000
- - - - $38,304 4,788 - - -
-
kWh
-
-
kW-months/year
$38,304
4,788
MMBtu
-
-
$
06: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$30,220
Cost:
-
- - - - $30,220 3,777 - - -
-
kWh
-
-
kW-months/year
$30,220
3,777
MMBtu
-
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$26,630
Cost:
$160,000
$5,534 102,482 - - $21,096 2,637 - - $5,534
102,482
kWh
-
-
kW-months/year
$21,096
2,637
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$22,000
Cost:
-
$16,783 310,800 $5,217 37 - - - - $16,783
310,800
kWh
$5,217
37
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,675
Cost:
$45,000
$8,100 150,000 $10,575 75 - - - - $8,100
150,000
kWh
$10,575
75
kW-months/year
-
-
MMBtu
-
-
$
10: 2.714 Hardware Savings:
$8,341
Cost:
$29,290
$4,577 84,762 $3,348 24 - - $416 - $4,577
84,762
kWh
$3,348
24
kW-months/year
-
-
MMBtu
$416
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,999
Cost:
$7,312
$5,999 111,088 - - - - - - $5,999
111,088
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,278
Cost:
-
$975 18,060 $303 2 - - - - $975
18,060
kWh
$303
2
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$352,859
Cost:
$269,127
$108,643 2,058,139 $39,385 297 $202,412 26,301 $2,419 - $108,643
2,058,139
kWh
$39,385
297
kW-months/year
$202,412
26,301
MMBtu
$2,419
-
$
TOTAL IMPLEMENTED Savings:
$79,149
Cost:
$1,000
$39,017 768,768 $9,912 88 $30,220 3,777 - - $39,017
768,768
kWh
$9,912
88
kW-months/year
$30,220
3,777
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes