IAC Assessment: UD0793
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2009
Principal Product Water Softeners
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 91,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 6,120
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,467 2,741,900 kWh $0.04
Electricity Demand $91,815 7,704 kW-months/year $11.92
Natural Gas $12,830 1,017 MMBtu $12.62
TOTAL ENERGY COSTS $232,603
RECOMMENDED SAVINGS* $39,085 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,635
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,450
Cost:
$25,000
$5,439 159,956 $4,046 26 - - - - $(-1,035) - - - $5,439
159,956
kWh
$4,046
26
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,035)
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,677
Cost:
$1,000
$3,829 112,608 $2,848 18 - - - - - - - - $3,829
112,608
kWh
$2,848
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,960
Cost:
$500
- - - - $3,960 314 - - - - - - -
-
kWh
-
-
kW-months/year
$3,960
314
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$3,855
Cost:
-
$3,855 25 - - - - - - - - - - $3,855
25
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,799
Cost:
$400
$2,313 68,034 $1,486 10 - - - - - - - - $2,313
68,034
kWh
$1,486
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,114
Cost:
-
$1,774 52,182 $1,340 30 - - - - - - - - $1,774
52,182
kWh
$1,340
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,970
Cost:
$1,000
- - - - - - $2,970 640,332 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,970
640,332
Tgal
-
-
$
-
-
$
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$2,460
Cost:
$2,500
- - - - - - $2,460 311,938 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,460
311,938
Tgal
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,488
Cost:
-
$853 25,092 $635 4 - - - - - - - - $853
25,092
kWh
$635
4
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,256
Cost:
$4,820
$539 15,863 $401 3 - - - - $316 - - - $539
15,863
kWh
$401
3
kW-months/year
-
-
MMBtu
-
-
Tgal
$316
-
$
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$621
Cost:
$1,000
$2,122 62,424 $1,579 10 - - - - $(-2,880) - $(-200) - $2,122
62,424
kWh
$1,579
10
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-2,880)
-
$
$(-200)
-
$
12: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$435
Cost:
-
$250 7,344 $185 1 - - - - - - - - $250
7,344
kWh
$185
1
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$39,085
Cost:
$36,220
$20,974 503,528 $12,520 102 $3,960 314 $5,430 952,270 $(-3,599) - $(-200) - $20,974
503,528
kWh
$12,520
102
kW-months/year
$3,960
314
MMBtu
$5,430
952,270
Tgal
$(-3,599)
-
$
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$29,635
Cost:
$30,500
$17,872 412,287 $10,448 88 - - $5,430 952,270 $(-3,915) - $(-200) - $17,872
412,287
kWh
$10,448
88
kW-months/year
-
-
MMBtu
$5,430
952,270
Tgal
$(-3,915)
-
$
$(-200)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material