Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2009 |
Principal Product | Water Softeners |
NAICS | 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 91,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $99,467 | 2,741,900 | kWh | $0.04 |
Electricity Demand | $91,815 | 7,704 | kW-months/year | $11.92 |
Natural Gas | $12,830 | 1,017 | MMBtu | $12.62 |
TOTAL ENERGY COSTS | $232,603 | |||
RECOMMENDED SAVINGS* | $39,085 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,450 Cost: $25,000 |
$5,439 | 159,956 | $4,046 | 26 | - | - | - | - | $(-1,035) | - | - | - |
$5,439 159,956 kWh |
$4,046 26 kW-months/year |
- - MMBtu |
- - Tgal |
$(-1,035) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,677 Cost: $1,000 |
$3,829 | 112,608 | $2,848 | 18 | - | - | - | - | - | - | - | - |
$3,829 112,608 kWh |
$2,848 18 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,960 Cost: $500 |
- | - | - | - | $3,960 | 314 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,960 314 MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $3,855 Cost: - |
$3,855 | 25 | - | - | - | - | - | - | - | - | - | - |
$3,855 25 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,799 Cost: $400 |
$2,313 | 68,034 | $1,486 | 10 | - | - | - | - | - | - | - | - |
$2,313 68,034 kWh |
$1,486 10 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $3,114 Cost: - |
$1,774 | 52,182 | $1,340 | 30 | - | - | - | - | - | - | - | - |
$1,774 52,182 kWh |
$1,340 30 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,970 Cost: $1,000 |
- | - | - | - | - | - | $2,970 | 640,332 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,970 640,332 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $2,460 Cost: $2,500 |
- | - | - | - | - | - | $2,460 | 311,938 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,460 311,938 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,488 Cost: - |
$853 | 25,092 | $635 | 4 | - | - | - | - | - | - | - | - |
$853 25,092 kWh |
$635 4 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,256 Cost: $4,820 |
$539 | 15,863 | $401 | 3 | - | - | - | - | $316 | - | - | - |
$539 15,863 kWh |
$401 3 kW-months/year |
- - MMBtu |
- - Tgal |
$316 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $621 Cost: $1,000 |
$2,122 | 62,424 | $1,579 | 10 | - | - | - | - | $(-2,880) | - | $(-200) | - |
$2,122 62,424 kWh |
$1,579 10 kW-months/year |
- - MMBtu |
- - Tgal |
$(-2,880) - $ |
$(-200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $435 Cost: - |
$250 | 7,344 | $185 | 1 | - | - | - | - | - | - | - | - |
$250 7,344 kWh |
$185 1 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,085 Cost: $36,220 |
$20,974 | 503,528 | $12,520 | 102 | $3,960 | 314 | $5,430 | 952,270 | $(-3,599) | - | $(-200) | - | $20,974 503,528 kWh |
$12,520 102 kW-months/year |
$3,960 314 MMBtu |
$5,430 952,270 Tgal |
$(-3,599) - $ |
$(-200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,635 Cost: $30,500 |
$17,872 | 412,287 | $10,448 | 88 | - | - | $5,430 | 952,270 | $(-3,915) | - | $(-200) | - | $17,872 412,287 kWh |
$10,448 88 kW-months/year |
- - MMBtu |
$5,430 952,270 Tgal |
$(-3,915) - $ |
$(-200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Primary Raw Material |