IAC Assessment: UD0794
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2009
Principal Product Hardwood Veneer
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 84,400
Annual Production 5,235,099 Units
Production Hrs. Annual 3,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,156 7,862,000 kWh $0.06
Natural Gas $18,073 1,765 MMBtu $10.24
TOTAL ENERGY COSTS $513,850
RECOMMENDED SAVINGS* $160,294 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,680
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.5194 REDESIGN PROCESS Savings:
$60,982
Cost:
$300,000
- - - - - - $10,982 1,074 - - $50,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$10,982
1,074
MMBtu
-
-
Tgal
$50,000
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$46,758
Cost:
-
- - $46,758 309 - - - - - - - - -
-
kWh
$46,758
309
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$20,779
Cost:
$50,000
- - - - $20,779 - - - - - - - -
-
kWh
-
-
kW-months/year
$20,779
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,841
Cost:
$10,000
$5,720 142,128 $4,121 39 - - - - - - - - $5,720
142,128
kWh
$4,121
39
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$7,981
Cost:
$19,425
$7,981 275,232 - - - - - - - - - - $7,981
275,232
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,273
Cost:
$1,000
- - - - - - - - $6,273 25,365 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,273
25,365
Tgal
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,255
Cost:
-
$1,363 47,000 $1,892 13 - - - - - - - - $1,363
47,000
kWh
$1,892
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,202
Cost:
-
$1,341 46,248 $1,861 12 - - - - - - - - $1,341
46,248
kWh
$1,861
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,223
Cost:
$1,000
$512 17,672 $711 5 - - - - - - - - $512
17,672
kWh
$711
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$160,294
Cost:
$381,425
$16,917 528,280 $55,343 378 $20,779 - $10,982 1,074 $6,273 25,365 $50,000 - $16,917
528,280
kWh
$55,343
378
kW-months/year
$20,779
-
$
$10,982
1,074
MMBtu
$6,273
25,365
Tgal
$50,000
-
$
TOTAL IMPLEMENTED Savings:
$7,680
Cost:
$1,000
$3,216 110,920 $4,464 30 - - - - - - - - $3,216
110,920
kWh
$4,464
30
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Administrative Changes