IAC logo
IAC Assessment: UD0800
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0800
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2009
Principal Product newspapers
NAICS 511199 - All Other Publishers
SIC 2711 - Newspapers
Sales $5,000,000-$10,000,000
# of Employees 33
Plant Area (Sq.Ft.) 48,800
Annual Production 30,000,000 Pieces
Production Hrs. Annual 2,184
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,490 995,600 kWh $0.14
Natural Gas $45,043 3,762 MMBtu $11.97
TOTAL ENERGY COSTS $186,030
RECOMMENDED SAVINGS* $101,443 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,912
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$42,596
Cost:
-
- - $42,596 402 - - - - - - -
-
kWh
$42,596
402
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$27,253
Cost:
$138,000
$14,889 108,677 - - $7,864 657 - - $4,500 - $14,889
108,677
kWh
-
-
kW-months/year
$7,864
657
MMBtu
-
-
Tgal
$4,500
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$18,713
Cost:
$7,500
$5,774 69,400 - - $12,939 1,081 - - - - $5,774
69,400
kWh
-
-
kW-months/year
$12,939
1,081
MMBtu
-
-
Tgal
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,047
Cost:
-
$3,366 76,494 - - $2,681 224 - - - - $3,366
76,494
kWh
-
-
kW-months/year
$2,681
224
MMBtu
-
-
Tgal
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,892
Cost:
$2,000
$(-90) (-1,713) $(-76) (-1) $4,058 339 - - - - $(-90)
(-1,713)
kWh
$(-76)
(-1)
kW-months/year
$4,058
339
MMBtu
-
-
Tgal
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,306
Cost:
-
$988 22,464 $318 3 - - - - - - $988
22,464
kWh
$318
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$700
Cost:
$4,239
$316 7,191 $349 3 - - - - $35 - $316
7,191
kWh
$349
3
kW-months/year
-
-
MMBtu
-
-
Tgal
$35
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$444
Cost:
$1,000
$211 4,805 $233 2 - - - - - - $211
4,805
kWh
$233
2
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$330
Cost:
$300
- - - - - - $330 109,223 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$330
109,223
Tgal
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$162
Cost:
$250
$77 1,747 $85 1 - - - - - - $77
1,747
kWh
$85
1
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$101,443
Cost:
$153,289
$25,531 289,065 $43,505 410 $27,542 2,301 $330 109,223 $4,535 - $25,531
289,065
kWh
$43,505
410
kW-months/year
$27,542
2,301
MMBtu
$330
109,223
Tgal
$4,535
-
$
TOTAL IMPLEMENTED Savings:
$35,912
Cost:
$143,489
$19,847 221,378 $985 9 $10,545 881 - - $4,535 - $19,847
221,378
kWh
$985
9
kW-months/year
$10,545
881
MMBtu
-
-
Tgal
$4,535
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes