IAC logo
IAC Assessment: UD0806
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0806
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2009
Principal Product Warm/cold forgings with machining
NAICS 332111 - Iron and Steel Forging
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 148
Plant Area (Sq.Ft.) 138,000
Annual Production 34,200,000 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $925,609 10,620,400 kWh $0.09
Natural Gas $519,579 48,281 MMBtu $10.76
TOTAL ENERGY COSTS $1,497,909
RECOMMENDED SAVINGS* $391,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $271,933
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$169,364
Cost:
-
- - $169,364 1,155 - - - - - - - - -
-
kWh
$169,364
1,155
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$75,878
Cost:
-
$75,878 1,764,600 - - - - - - - - - - $75,878
1,764,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$38,287
Cost:
$157,500
$20,640 480,000 $17,647 90 - - - - - - - - $20,640
480,000
kWh
$17,647
90
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$29,959
Cost:
$10,000
- - - - $29,959 2,784 - - - - - - -
-
kWh
-
-
kW-months/year
$29,959
2,784
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$11,513
Cost:
$5,220
- - - - $11,513 1,070 - - - - - - -
-
kWh
-
-
kW-months/year
$11,513
1,070
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,900
Cost:
$5,010
- - - - $10,900 1,013 - - - - - - -
-
kWh
-
-
kW-months/year
$10,900
1,013
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,909
Cost:
$17,420
$4,571 106,303 $3,474 18 - - - - $864 - - - $4,571
106,303
kWh
$3,474
18
kW-months/year
-
-
MMBtu
-
-
Tgal
$864
-
$
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,238
Cost:
$64,000
$8,238 - - - - - - - - - - - $8,238
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,111
Cost:
$12,665
$5,770 134,180 $4,385 22 - - - - $(-2,044) - - - $5,770
134,180
kWh
$4,385
22
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-2,044)
-
$
-
-
$
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,025
Cost:
$3,000
- - - - $6,025 560 - - - - - - -
-
kWh
-
-
kW-months/year
$6,025
560
MMBtu
-
-
Tgal
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,165
Cost:
$11,747
$5,165 120,120 - - - - - - - - - - $5,165
120,120
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,652
Cost:
$990
$2,087 48,524 $1,586 8 - - - - $(-21) - - - $2,087
48,524
kWh
$1,586
8
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-21)
-
$
-
-
$
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,419
Cost:
$748
$1,419 33,000 $2,000 10 - - - - - - - - $1,419
33,000
kWh
$2,000
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,400
Cost:
$6,174
$2,291 53,276 $1,741 9 - - - - $(-632) - - - $2,291
53,276
kWh
$1,741
9
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-632)
-
$
-
-
$
15: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$2,991
Cost:
$15,000
- - - - $2,991 278 - - - - - - -
-
kWh
-
-
kW-months/year
$2,991
278
MMBtu
-
-
Tgal
-
-
$
-
-
$
16: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,636
Cost:
$4,000
- - - - - - $2,636 1,376 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,636
1,376
Tgal
-
-
$
-
-
$
17: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,995
Cost:
-
$1,995 46,400 - - - - - - - - - - $1,995
46,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
18: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$624
Cost:
$1,000
$1,078 22,000 $946 5 - - - - $(-1,200) - $(-200) - $1,078
22,000
kWh
$946
5
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,200)
-
$
$(-200)
-
$
TOTAL RECOMMENDED Savings:
$391,066
Cost:
$314,474
$129,132 2,808,403 $201,143 1,317 $61,388 5,705 $2,636 1,376 $(-3,033) - $(-200) - $129,132
2,808,403
kWh
$201,143
1,317
kW-months/year
$61,388
5,705
MMBtu
$2,636
1,376
Tgal
$(-3,033)
-
$
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$271,933
Cost:
$38,249
$93,670 2,175,283 $181,496 1,217 - - - - $(-3,033) - $(-200) - $93,670
2,175,283
kWh
$181,496
1,217
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-3,033)
-
$
$(-200)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost