IAC Assessment: UD0834
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0834
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2011
Principal Product Gray and Ductile Castings
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 40,000
Annual Production 1,100 Tons
Production Hrs. Annual 2,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,815 549,455 kWh $0.09
Electricity Demand $28,748 614 kW-months/year $46.82
Electricity Fees $4,964 - $ -
Natural Gas $26,565 2,225 MMBtu $11.94
TOTAL ENERGY COSTS $111,133
RECOMMENDED SAVINGS* $11,364 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,398
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$688
Cost:
$3,315
$519 6,024 $137 2 - - $32 - $519
6,024
kWh
$137
2
kW-months/year
-
-
MMBtu
$32
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$251
Cost:
$860
$185 2,153 $49 1 - - $17 - $185
2,153
kWh
$49
1
kW-months/year
-
-
MMBtu
$17
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$197
Cost:
$665
$158 1,835 $42 1 - - $(-3) - $158
1,835
kWh
$42
1
kW-months/year
-
-
MMBtu
$(-3)
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$408
Cost:
$25
$323 3,750 $85 2 - - - - $323
3,750
kWh
$85
2
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$211
Cost:
$25
$167 1,935 $44 1 - - - - $167
1,935
kWh
$44
1
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,027
Cost:
$6,500
$2,624 30,472 $403 7 - - - - $2,624
30,472
kWh
$403
7
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$6,582
Cost:
$2,349
- - - - $6,582 551 - - -
-
kWh
-
-
kW-months/year
$6,582
551
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,364
Cost:
$13,739
$3,976 46,169 $760 14 $6,582 551 $46 - $3,976
46,169
kWh
$760
14
kW-months/year
$6,582
551
MMBtu
$46
-
$
TOTAL IMPLEMENTED Savings:
$7,398
Cost:
$3,064
$648 7,520 $171 4 $6,582 551 $(-3) - $648
7,520
kWh
$171
4
kW-months/year
$6,582
551
MMBtu
$(-3)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes