IAC Assessment: UD0851
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0851
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2012
Principal Product Paint
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $100,000,000-$500,000,000
# of Employees 192
Plant Area (Sq.Ft.) 216,437
Annual Production 4,669 Thousand Gallons
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $346,659 6,503,400 kWh $0.05
Electricity Demand $203,500 13,560 kW-months/year $15.01
Natural Gas $294,363 56,380 MMBtu $5.22
TOTAL ENERGY COSTS $844,522
RECOMMENDED SAVINGS* $197,136 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$12,842
Cost:
$42,695
$1,688 29,040 - - $7,623 - - - - - - - $3,531 - $1,688
29,040
kWh
-
-
kW-months/year
$7,623
-
$
-
-
MMBtu
-
-
$
-
-
$
$3,531
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,873
Cost:
$4,016
$7,671 131,993 $2,863 168 - - - - - - $339 - - - $7,671
131,993
kWh
$2,863
168
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$339
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,335
Cost:
$3,379
$5,516 94,913 $2,863 168 - - - - $(-44) - - - - - $5,516
94,913
kWh
$2,863
168
kW-months/year
-
-
$
-
-
MMBtu
$(-44)
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,426
Cost:
$3,660
$520 8,954 $891 48 - - - - $15 - - - - - $520
8,954
kWh
$891
48
kW-months/year
-
-
$
-
-
MMBtu
$15
-
$
-
-
$
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$7,266
Cost:
$7,300
$5,829 100,288 $1,437 86 - - - - - - - - - - $5,829
100,288
kWh
$1,437
86
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$15,652
Cost:
$20,000
$11,372 195,672 $4,280 264 - - - - - - - - - - $11,372
195,672
kWh
$4,280
264
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,543
Cost:
-
$5,789 99,608 $2,754 166 - - - - - - - - - - $5,789
99,608
kWh
$2,754
166
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,739
Cost:
$12,000
$(-80) (-1,380) $(-39) (-3) - - $5,858 1,122 - - - - - - $(-80)
(-1,380)
kWh
$(-39)
(-3)
kW-months/year
-
-
$
$5,858
1,122
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,111
Cost:
$5,000
$2,786 47,935 $1,325 84 - - - - - - - - - - $2,786
47,935
kWh
$1,325
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,847
Cost:
$1,000
$2,271 32,040 $876 48 - - - - - - $(-300) - - - $2,271
32,040
kWh
$876
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-300)
-
$
-
-
$
11: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$69,895
Cost:
$32,000
- - - - - - $69,895 13,390 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$69,895
13,390
MMBtu
-
-
$
-
-
$
-
-
$
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$27,723
Cost:
$31,000
- - - - - - $27,723 5,311 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$27,723
5,311
MMBtu
-
-
$
-
-
$
-
-
$
13: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$5,863
Cost:
$5,000
- - - - - - $5,863 1,124 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,863
1,124
MMBtu
-
-
$
-
-
$
-
-
$
14: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,300
Cost:
$1,000
- - - - - - $5,300 1,015 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,300
1,015
MMBtu
-
-
$
-
-
$
-
-
$
15: 2.7314 REDUCE VENTILATION AIR Savings:
$10,721
Cost:
$32,160
$1,672 28,768 - - - - $9,049 1,733 - - - - - - $1,672
28,768
kWh
-
-
kW-months/year
-
-
$
$9,049
1,733
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$197,136
Cost:
$200,210
$45,034 767,831 $17,250 1,030 $7,623 - $123,688 23,695 $(-29) - $39 - $3,531 - $45,034
767,831
kWh
$17,250
1,030
kW-months/year
$7,623
-
$
$123,688
23,695
MMBtu
$(-29)
-
$
$39
-
$
$3,531
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost