IAC Assessment: UD0857
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0857
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2012
Principal Product Powder Coated Metal Parts
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 75,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 3,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,914 1,231,921 kWh $0.07
Electricity Demand $16,927 3,588 kW-months/year $4.72
Electricity Fees $192 - $ -
Natural Gas $199,542 27,660 MMBtu $7.21
TOTAL ENERGY COSTS $318,436
RECOMMENDED SAVINGS* $65,903 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 3.1222 REDUCE WATER USE WITH COUNTER CURRENT RINSING Savings:
$4,781
Cost:
$2,000
- - - - - - $4,781 1,727,880 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,781
1,727,880
Tgal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,979
Cost:
$11,880
$3,701 50,953 $1,155 240 - - - - $123 - - - - - $3,701
50,953
kWh
$1,155
240
kW-months/year
-
-
MMBtu
-
-
Tgal
$123
-
$
-
-
$
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,696
Cost:
$6,800
$1,206 16,606 - - - - $2,490 899,844 - - - - - - $1,206
16,606
kWh
-
-
kW-months/year
-
-
MMBtu
$2,490
899,844
Tgal
-
-
$
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,324
Cost:
$15,150
$6,240 85,907 $1,084 228 - - - - - - - - - - $6,240
85,907
kWh
$1,084
228
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$834
Cost:
$2,000
$686 9,439 $148 31 - - - - - - - - - - $686
9,439
kWh
$148
31
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$807
Cost:
$1,000
$910 12,533 $197 42 - - - - - - $(-300) - - - $910
12,533
kWh
$197
42
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-300)
-
$
-
-
$
07: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$7,051
Cost:
$2,000
- - - - $7,051 978 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,051
978
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,178
Cost:
$36,000
- - - - $12,178 1,689 - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,178
1,689
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,816
Cost:
$2,680
- - - - $4,816 668 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,816
668
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$19,437
Cost:
$211,596
$5,383 74,110 - - - - - - - - - - $14,054 - $5,383
74,110
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$14,054
-
$
TOTAL RECOMMENDED Savings:
$65,903
Cost:
$291,106
$18,126 249,548 $2,584 541 $24,045 3,335 $7,271 2,627,724 $123 - $(-300) - $14,054 - $18,126
249,548
kWh
$2,584
541
kW-months/year
$24,045
3,335
MMBtu
$7,271
2,627,724
Tgal
$123
-
$
$(-300)
-
$
$14,054
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost