IAC Assessment: UD0878
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0878
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2013
Principal Product Foundry
NAICS 331513 - Steel Foundries (except Investment)
SIC 3325 - Steel Foundries, Nec
Sales <$500,000
# of Employees 50
Plant Area (Sq.Ft.) 255,800
Annual Production 1,267,048 Pounds
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,011,951 13,296,727 kWh $0.08
Electricity Demand $102,366 36,000 kW-months/year $2.84
Natural Gas $377,370 68,211 MMBtu $5.53
TOTAL ENERGY COSTS $1,527,131
RECOMMENDED SAVINGS* $97,692 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,712
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,520
Cost:
-
- - $8,520 3,000 - - - - - - -
-
kWh
$8,520
3,000
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,314
Cost:
$9,180
$4,950 86,596 $364 128 - - - - - - $4,950
86,596
kWh
$364
128
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,934
Cost:
-
$3,189 55,774 $745 263 - - - - - - $3,189
55,774
kWh
$745
263
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,749
Cost:
$19,400
$10,333 180,747 $2,416 851 - - - - - - $10,333
180,747
kWh
$2,416
851
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,303
Cost:
$1,000
$5,901 103,211 $402 142 - - - - - - $5,901
103,211
kWh
$402
142
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,575
Cost:
$15,000
- - - - $16,575 2,997 - - - - -
-
kWh
-
-
kW-months/year
$16,575
2,997
MMBtu
-
-
Tgal
-
-
gal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$21,594
Cost:
$4,000
- - - - - - $6,837 3,679 $14,757 3,679,412 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,837
3,679
Tgal
$14,757
3,679,412
gal
08: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,800
Cost:
$2,000
$1,800 31,482 - - - - - - - - $1,800
31,482
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$20,903
Cost:
$15,000
- - - - $20,903 3,780 - - - - -
-
kWh
-
-
kW-months/year
$20,903
3,780
MMBtu
-
-
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$97,692
Cost:
$65,580
$26,173 457,810 $12,447 4,384 $37,478 6,777 $6,837 3,679 $14,757 3,679,412 $26,173
457,810
kWh
$12,447
4,384
kW-months/year
$37,478
6,777
MMBtu
$6,837
3,679
Tgal
$14,757
3,679,412
gal
TOTAL IMPLEMENTED Savings:
$36,712
Cost:
$25,180
$10,851 189,807 $9,286 3,270 $16,575 2,997 - - - - $10,851
189,807
kWh
$9,286
3,270
kW-months/year
$16,575
2,997
MMBtu
-
-
Tgal
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)