IAC Assessment: UD0890
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0890
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2013
Principal Product Defense Combat Vehicles
NAICS 336992 - Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3795 - Tanks And Tank Components
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 1,600,000
Annual Production 150 Pieces
Production Hrs. Annual 2,125
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,061,206 46,527,600 kWh $0.04
Electricity Demand $1,180,412 93,636 kW-months/year $12.61
Natural Gas $662,576 145,461 MMBtu $4.56
Coal $1,272,701 200,198 MMBtu $6.36
TOTAL ENERGY COSTS $5,176,895
RECOMMENDED SAVINGS* $2,288,717 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $767,386
#|Description Savings
Cost
Status Electricity Usage Natural Gas Coal Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Coal Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$544,478
Cost:
-
$33,135 768,082 $(-640,879) (-140,698) $1,152,222 181,247 - - - - $33,135
768,082
kWh
$(-640,879)
(-140,698)
MMBtu
$1,152,222
181,247
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,847
Cost:
-
- - $1,847 406 - - - - - - -
-
kWh
$1,847
406
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$37,340
Cost:
-
- - - - - - - - $37,340 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$37,340
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$136,711
Cost:
-
$136,711 3,169,000 - - - - - - - - $136,711
3,169,000
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,587
Cost:
$19,427
$10,009 232,016 - - - - $578 - - - $10,009
232,016
kWh
-
-
MMBtu
-
-
MMBtu
$578
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,216
Cost:
-
$5,216 120,918 - - - - - - - - $5,216
120,918
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$37,438
Cost:
$6,000
$7,844 181,838 $29,594 5,047 - - - - - - $7,844
181,838
kWh
$29,594
5,047
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,203
Cost:
-
$6,203 143,780 - - - - - - - - $6,203
143,780
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$176,886
Cost:
$101,000
$176,886 4,100,283 - - - - - - - - $176,886
4,100,283
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
10: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$746,973
Cost:
$100,000
$112,915 2,617,416 $173,812 29,661 $460,246 78,540 - - - - $112,915
2,617,416
kWh
$173,812
29,661
MMBtu
$460,246
78,540
MMBtu
-
-
$
-
-
$
11: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$565,879
Cost:
$1,157,500
- - $(-452,279) (-99,293) $1,018,158 160,158 - - - - -
-
kWh
$(-452,279)
(-99,293)
MMBtu
$1,018,158
160,158
MMBtu
-
-
$
-
-
$
12: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$19,159
Cost:
-
$19,159 444,119 - - - - - - - - $19,159
444,119
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$2,288,717
Cost:
$1,383,927
$508,078 11,777,452 $(-887,905) (-204,877) $2,630,626 419,945 $578 - $37,340 - $508,078
11,777,452
kWh
$(-887,905)
(-204,877)
MMBtu
$2,630,626
419,945
MMBtu
$578
-
$
$37,340
-
$
TOTAL IMPLEMENTED Savings:
$767,386
Cost:
$6,000
$189,109 4,383,618 $(-611,285) (-135,651) $1,152,222 181,247 - - $37,340 - $189,109
4,383,618
kWh
$(-611,285)
(-135,651)
MMBtu
$1,152,222
181,247
MMBtu
-
-
$
$37,340
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Natural Gas Coal Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Coal Administrative Changes One-time Revenue or Avoided Cost