Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2016 |
Principal Product | Mixing Equipment |
NAICS | 333249 - Other Industrial Machinery Manufacturing |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 175,000 |
Annual Production | 160,000 Units |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $273,631 | 3,966,462 | kWh | $0.07 |
Electricity Demand | $57,641 | 9,168 | kW-months/year | $6.29 |
Electricity Fees | $1 | - | $ | - |
Natural Gas | $46,606 | 5,353 | MMBtu | $8.71 |
TOTAL ENERGY COSTS | $377,879 | |||
RECOMMENDED SAVINGS* | $87,545 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,953 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $15,501 Cost: - |
- | - | $15,501 | 2,349 | - | - | - | - | - | - |
- - kWh |
$15,501 2,349 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE |
Savings: $7,063 Cost: - |
$452 | 6,656 | - | - | $6,611 | 759 | - | - | - | - |
$452 6,656 kWh |
- - kW-months/year |
$6,611 759 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,975 Cost: - |
$2,499 | 36,803 | $476 | 72 | - | - | - | - | - | - |
$2,499 36,803 kWh |
$476 72 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,213 Cost: - |
$918 | 13,524 | $295 | 45 | - | - | - | - | - | - |
$918 13,524 kWh |
$295 45 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,040 Cost: $1,000 |
$4,300 | 63,329 | $820 | 124 | - | - | $(-1,080) | - | - | - |
$4,300 63,329 kWh |
$820 124 kW-months/year |
- - MMBtu |
$(-1,080) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $29,859 Cost: $86,636 |
$25,655 | 377,931 | $4,890 | 741 | - | - | $(-686) | - | - | - |
$25,655 377,931 kWh |
$4,890 741 kW-months/year |
- - MMBtu |
$(-686) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,818 Cost: $6,804 |
$3,854 | 56,754 | $734 | 111 | - | - | $230 | - | - | - |
$3,854 56,754 kWh |
$734 111 kW-months/year |
- - MMBtu |
$230 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,660 Cost: $7,056 |
$4,182 | 61,591 | $77 | 12 | - | - | $401 | - | - | - |
$4,182 61,591 kWh |
$77 12 kW-months/year |
- - MMBtu |
$401 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS |
Savings: $17,416 Cost: $4,660 |
$48 | 703 | $27 | 4 | - | - | - | - | $17,341 | - |
$48 703 kWh |
$27 4 kW-months/year |
- - MMBtu |
- - $ |
$17,341 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $87,545 Cost: $106,156 |
$41,908 | 617,291 | $22,820 | 3,458 | $6,611 | 759 | $(-1,135) | - | $17,341 | - | $41,908 617,291 kWh |
$22,820 3,458 kW-months/year |
$6,611 759 MMBtu |
$(-1,135) - $ |
$17,341 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,953 Cost: $93,440 |
$30,879 | 454,865 | $5,919 | 897 | $6,611 | 759 | $(-456) | - | - | - | $30,879 454,865 kWh |
$5,919 897 kW-months/year |
$6,611 759 MMBtu |
$(-456) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material |