IAC logo
IAC Assessment: UD1004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2019
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 110,000
Annual Production 3,526,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,225 5,402,600 kWh $0.05
Electricity Demand $41,561 11,053 kW-months/year $3.76
Electricity Fees $194,213 - $ -
Natural Gas $30,276 4,684 MMBtu $6.46
TOTAL ENERGY COSTS $509,275
RECOMMENDED SAVINGS* $53,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$34,429
Cost:
-
$34,429 764,747 - - $34,429
764,747
kWh
-
-
kW-months/year
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,197
Cost:
-
$3,766 83,647 $431 115 $3,766
83,647
kWh
$431
115
kW-months/year
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,185
Cost:
-
$2,185 48,526 - - $2,185
48,526
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,533
Cost:
-
$7,758 172,324 $1,775 472 $7,758
172,324
kWh
$1,775
472
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,158
Cost:
-
$3,158 70,151 - - $3,158
70,151
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$53,502
Cost:
-
$51,296 1,139,395 $2,206 587 $51,296
1,139,395
kWh
$2,206
587
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand