Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2022 |
Principal Product | Circuits and Cable Harnesses |
NAICS | 334412 - Bare Printed Circuit Board Manufacturing |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 31,210 |
Annual Production | 1,705,322 Units |
Production Hrs. Annual | 5,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $48,470 | 797,316 | kWh | $0.06 |
Electricity Demand | $16,668 | 2,604 | kW-months/year | $6.40 |
Electricity Fees | $12,309 | - | $ | - |
Natural Gas | $7,925 | 896 | MMBtu | $8.84 |
TOTAL ENERGY COSTS | $107,812 | |||
RECOMMENDED SAVINGS* | $35,318 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,357 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $12,359 Cost: - |
- | - | - | - | - | - | $1,959 | - | $10,400 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$1,959 - $ |
$10,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $936 Cost: - |
$836 | 5,928 | $100 | 10 | - | - | - | - | - | - |
$836 5,928 kWh |
$100 10 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $5,243 Cost: $400 |
$5,243 | 37,186 | - | - | - | - | - | - | - | - |
$5,243 37,186 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $199 Cost: $44 |
$152 | 1,080 | $47 | 5 | - | - | - | - | - | - |
$152 1,080 kWh |
$47 5 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $671 Cost: $256 |
- | - | - | - | $671 | 166 | - | - | - | - |
- - kWh |
- - kW-months/year |
$671 166 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,155 Cost: $1,552 |
$1,002 | 7,109 | $153 | 16 | - | - | - | - | - | - |
$1,002 7,109 kWh |
$153 16 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,755 Cost: $26,460 |
$12,305 | 87,268 | $1,881 | 194 | - | - | - | - | $569 | - |
$12,305 87,268 kWh |
$1,881 194 kW-months/year |
- - Tgal |
- - $ |
$569 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,318 Cost: $28,712 |
$19,538 | 138,571 | $2,181 | 225 | $671 | 166 | $1,959 | - | $10,969 | - | $19,538 138,571 kWh |
$2,181 225 kW-months/year |
$671 166 Tgal |
$1,959 - $ |
$10,969 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,357 Cost: $26,860 |
$17,548 | 124,454 | $1,881 | 194 | - | - | $1,959 | - | $10,969 | - | $17,548 124,454 kWh |
$1,881 194 kW-months/year |
- - Tgal |
$1,959 - $ |
$10,969 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Primary Raw Material | Ancillary Material Cost |