IAC logo
IAC Assessment: UD1058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Air and Gas Compressors
NAICS 333912 - Air and Gas Compressor Manufacturing
SIC 3563 - Air And Gas Compressors
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 250,000
Annual Production 584 Units
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,292 2,559,352 kWh $0.09
Electricity Demand $63,498 12,551 kW-months/year $5.06
Electricity Fees $7,183 - $ -
Natural Gas $85,183 17,259 MMBtu $4.94
TOTAL ENERGY COSTS $405,699
RECOMMENDED SAVINGS* $79,334 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,225
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$23,188
Cost:
-
- - $23,188 4,584 - - - - - - -
-
kWh
$23,188
4,584
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$282
Cost:
-
- - $282 56 - - - - - - -
-
kWh
$282
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$329
Cost:
-
$299 3,325 $30 6 - - - - - - $299
3,325
kWh
$30
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,990
Cost:
$11,117
$10,204 113,382 $786 155 - - - - - - $10,204
113,382
kWh
$786
155
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,636
Cost:
$952
$7,090 78,772 $546 108 - - - - - - $7,090
78,772
kWh
$546
108
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,653
Cost:
$1,115
- - - - $1,653 335 - - - - -
-
kWh
-
-
kW-months/year
$1,653
335
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,307
Cost:
$29,827
$19,340 215,040 $1,490 295 - - $3,556 - $9,921 - $19,340
215,040
kWh
$1,490
295
kW-months/year
-
-
MMBtu
$3,556
-
$
$9,921
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$949
Cost:
$290
$694 7,677 $159 32 - - $19 - $77 - $694
7,677
kWh
$159
32
kW-months/year
-
-
MMBtu
$19
-
$
$77
-
$
TOTAL RECOMMENDED Savings:
$79,334
Cost:
$43,301
$37,627 418,196 $26,481 5,235 $1,653 335 $3,575 - $9,998 - $37,627
418,196
kWh
$26,481
5,235
kW-months/year
$1,653
335
MMBtu
$3,575
-
$
$9,998
-
$
TOTAL IMPLEMENTED Savings:
$42,225
Cost:
$30,779
$26,430 293,812 $2,318 458 - - $3,556 - $9,921 - $26,430
293,812
kWh
$2,318
458
kW-months/year
-
-
MMBtu
$3,556
-
$
$9,921
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost