IAC Assessment: UD1107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2025
Principal Product Wood Shavings, Wood Flour, Pet Bedding
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 37
Plant Area (Sq.Ft.) 90,000
Annual Production 78,924 Tons
Production Hrs. Annual 7,488
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $958,922 13,238,400 kWh $0.07
Electricity Demand $190,891 30,157 kW-months/year $6.33
Electricity Fees $24,347 - $ -
Natural Gas $14,882 1,178 MMBtu $12.63
TOTAL ENERGY COSTS $1,199,297
RECOMMENDED SAVINGS* $302,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$228,685
Cost:
$136,500
- - - - $22,685 - - - - - $206,000 - -
-
kWh
-
-
kW-months/year
$22,685
-
$
-
-
$
-
-
$
$206,000
-
%
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$69,274
Cost:
-
- - $69,274 10,960 - - - - - - - - -
-
kWh
$69,274
10,960
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,345
Cost:
$953
$1,180 16,293 $165 26 - - - - - - - - $1,180
16,293
kWh
$165
26
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$412
Cost:
$900
$345 4,761 $67 11 - - - - - - - - $345
4,761
kWh
$67
11
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,839
Cost:
$5,280
$1,433 19,788 $201 32 - - $1,095 - $110 - - - $1,433
19,788
kWh
$201
32
kW-months/year
-
-
$
$1,095
-
$
$110
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$302,555
Cost:
$143,633
$2,958 40,842 $69,707 11,029 $22,685 - $1,095 - $110 - $206,000 - $2,958
40,842
kWh
$69,707
11,029
kW-months/year
$22,685
-
$
$1,095
-
$
$110
-
$
$206,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Increase in Production