Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1994
Principal Product Polystyrene Cups
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 84
Plant Area (Sq.Ft.) 125,000
Annual Production 0 Units
Production Hrs. Annual 8,500
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,214 3,857,855 kWh $0.07
Natural Gas $612,434 144,862 MMBtu $4.23
TOTAL ENERGY COSTS $869,648
RECOMMENDED SAVINGS* $197,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,524
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,252
Cost:
$9,802
$9,252 138,042 - - $9,252
138,042
kWh
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,048
Cost:
$1,584
$1,048 15,533 - - $1,048
15,533
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,272
Cost:
$594
$5,272 78,546 - - $5,272
78,546
kWh
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,257
Cost:
$512
$1,257 21,395 - - $1,257
21,395
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$147
Cost:
$200
$147 1,758 - - $147
1,758
kWh
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$180,408
Cost:
$500,000
- - $180,408 - -
-
kWh
$180,408
-
$
TOTAL RECOMMENDED Savings:
$197,384
Cost:
$512,692
$16,976 255,274 $180,408 - $16,976
255,274
kWh
$180,408
-
$
TOTAL IMPLEMENTED Savings:
$14,524
Cost:
$10,396
$14,524 216,588 - - $14,524
216,588
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes