IAC logo
IAC Assessment: UF0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1994
Principal Product PLASTIC INJECTION PARTS
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 38,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 7,448
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $543,591 7,924,385 kWh $0.07
TOTAL ENERGY COSTS $543,591
RECOMMENDED SAVINGS* $48,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,685
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,887
Cost:
$861
$5,887 85,287 $5,887
85,287
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,474
Cost:
$2,402
$1,474 21,395 $1,474
21,395
kWh
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,767
Cost:
-
$1,767 25,498 $1,767
25,498
kWh
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$529
Cost:
$888
$529 6,448 $529
6,448
kWh
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,106
Cost:
$4,950
$3,106 45,135 $3,106
45,135
kWh
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$15,128
Cost:
$40,000
$15,128 219,226 $15,128
219,226
kWh
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,114
Cost:
$4,373
$4,114 59,496 $4,114
59,496
kWh
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,061
Cost:
$1,150
$5,061 73,271 $5,061
73,271
kWh
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,510
Cost:
$2,800
$6,510 94,373 $6,510
94,373
kWh
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,908
Cost:
$12,000
$4,908 114,009 $4,908
114,009
kWh
TOTAL RECOMMENDED Savings:
$48,484
Cost:
$69,424
$48,484 744,138 $48,484
744,138
kWh
TOTAL IMPLEMENTED Savings:
$15,685
Cost:
$8,323
$15,685 227,140 $15,685
227,140
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage