IAC logo
IAC Assessment: UF0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1994
Principal Product Wooden Panels and Tambour
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $1,000,000-$5,000,000
# of Employees 44
Plant Area (Sq.Ft.) 50,000
Annual Production 50,000 Pieces
Production Hrs. Annual 2,080
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,404 562,720 kWh $0.11
Natural Gas $1,846 286 MMBtu $6.45
TOTAL ENERGY COSTS $64,250
RECOMMENDED SAVINGS* $14,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,818
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,824
Cost:
$990
$1,824 16,706 $1,824
16,706
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,107
Cost:
$2,459
$1,107 10,258 $1,107
10,258
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,040
Cost:
$4,519
$1,040 9,672 $1,040
9,672
kWh
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,715
Cost:
$20,100
$6,715 61,841 $6,715
61,841
kWh
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,894
Cost:
$1,496
$1,894 16,413 $1,894
16,413
kWh
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$917
Cost:
$64
$917 8,499 $917
8,499
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$604
Cost:
$879
$604 5,569 $604
5,569
kWh
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$183
Cost:
$15
$183 1,758 $183
1,758
kWh
TOTAL RECOMMENDED Savings:
$14,284
Cost:
$30,522
$14,284 130,716 $14,284
130,716
kWh
TOTAL IMPLEMENTED Savings:
$4,818
Cost:
$2,565
$4,818 43,376 $4,818
43,376
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage