IAC Assessment: UF0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Engine Ignition Systems
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 73,350
Annual Production 10,000 Pieces
Production Hrs. Annual 4,250
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $378,842 5,714,830 kWh $0.07
Natural Gas $33,353 5,314 MMBtu $6.28
TOTAL ENERGY COSTS $494,470
RECOMMENDED SAVINGS* $94,099 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,984
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Electricity Usage Other Liquid (haz)
$ kWh $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,084
Cost:
$3,497
$6,084 102,579 - - $6,084
102,579
kWh
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,601
Cost:
$6,761
$2,601 37,515 - - $2,601
37,515
kWh
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$146
Cost:
$280
$146 2,345 - - $146
2,345
kWh
-
-
gal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$143
Cost:
$128
$143 2,931 - - $143
2,931
kWh
-
-
gal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$774
Cost:
$1,819
$774 12,016 - - $774
12,016
kWh
-
-
gal
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$34,974
Cost:
-
$34,974 395,369 - - $34,974
395,369
kWh
-
-
gal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,816
Cost:
$42,705
$15,816 272,567 - - $15,816
272,567
kWh
-
-
gal
08: 2.7271 REPLACE ELECTRIC REHEAT WITH HEAT PIPES Savings:
$18,904
Cost:
$31,500
$18,904 829,719 - - $18,904
829,719
kWh
-
-
gal
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,373
Cost:
$9,000
$3,373 50,410 - - $3,373
50,410
kWh
-
-
gal
10: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$2,754
Cost:
$4,450
- - $2,754 594 -
-
kWh
$2,754
594
gal
11: 3.1131 USE MECHANICAL STRIPPING METHODS Savings:
$4,715
Cost:
$82
- - $4,715 210 -
-
kWh
$4,715
210
gal
12: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$3,815
Cost:
$2,500
- - $3,815 267 -
-
kWh
$3,815
267
gal
TOTAL RECOMMENDED Savings:
$94,099
Cost:
$102,722
$82,815 1,705,451 $11,284 1,071 $82,815
1,705,451
kWh
$11,284
1,071
gal
TOTAL IMPLEMENTED Savings:
$8,984
Cost:
$8,227
$6,230 104,924 $2,754 594 $6,230
104,924
kWh
$2,754
594
gal
Savings
Cost
$ kWh $ gal
Electricity Usage Other Liquid (haz) Electricity Usage Other Liquid (haz)