IAC Assessment: UF0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Fiberglass Boats
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 340,000
Annual Production 2,300 Pieces
Production Hrs. Annual 4,368
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $260,532 4,195,193 kWh $0.06
LPG $19,337 1,550 MMBtu $12.48
TOTAL ENERGY COSTS $334,589
RECOMMENDED SAVINGS* $91,223 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,401
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Primary Raw Material Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Primary Raw Material
$ kWh $ gal $ gal $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$31,040
Cost:
$7,890
$31,040 419,988 - - - - - - $31,040
419,988
kWh
-
-
gal
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,741
Cost:
$23,485
$7,741 128,664 - - - - - - $7,741
128,664
kWh
-
-
gal
-
-
gal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,754
Cost:
$10,491
$5,754 89,683 - - - - - - $5,754
89,683
kWh
-
-
gal
-
-
gal
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,198
Cost:
$4,450
$7,198 106,682 - - - - - - $7,198
106,682
kWh
-
-
gal
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,793
Cost:
$10,316
$2,793 42,204 - - - - - - $2,793
42,204
kWh
-
-
gal
-
-
gal
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$604
Cost:
$975
$604 11,430 - - - - - - $604
11,430
kWh
-
-
gal
-
-
gal
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,350
Cost:
$5,610
$10,350 152,110 - - - - - - $10,350
152,110
kWh
-
-
gal
-
-
gal
-
-
$
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$8,112
Cost:
-
- - $(-46,608) (-13,200) $54,720 13,200 - - -
-
kWh
$(-46,608)
(-13,200)
gal
$54,720
13,200
gal
-
-
$
09: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$17,631
Cost:
$7,000
- - - - - - $17,631 - -
-
kWh
-
-
gal
-
-
gal
$17,631
-
$
TOTAL RECOMMENDED Savings:
$91,223
Cost:
$70,217
$65,480 950,761 $(-46,608) (-13,200) $54,720 13,200 $17,631 - $65,480
950,761
kWh
$(-46,608)
(-13,200)
gal
$54,720
13,200
gal
$17,631
-
$
TOTAL IMPLEMENTED Savings:
$33,401
Cost:
$33,545
$25,289 387,456 $(-46,608) (-13,200) $54,720 13,200 - - $25,289
387,456
kWh
$(-46,608)
(-13,200)
gal
$54,720
13,200
gal
-
-
$
Savings
Cost
$ kWh $ gal $ gal $ $
Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Primary Raw Material Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Primary Raw Material