IAC logo
IAC Assessment: UF0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Supermarket Equipment
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 250,000
Annual Production 6,000 Pieces
Production Hrs. Annual 3,276
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $444,968 4,050,410 kWh $0.11
Natural Gas $16,589 2,151 MMBtu $7.71
TOTAL ENERGY COSTS $461,557
RECOMMENDED SAVINGS* $41,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,542
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,595
Cost:
$54,918
$25,595 213,365 - - $25,595
213,365
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$730
Cost:
$4,270
$730 6,448 - - $730
6,448
kWh
-
-
MMBtu
03: 2.7271 REPLACE ELECTRIC REHEAT WITH HEAT PIPES Savings:
$2,103
Cost:
$3,500
$2,103 22,274 - - $2,103
22,274
kWh
-
-
MMBtu
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,769
Cost:
$520
$1,769 18,757 - - $1,769
18,757
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,217
Cost:
$850
$6,217 56,565 - - $6,217
56,565
kWh
-
-
MMBtu
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$3,282
Cost:
$2,500
$3,282 34,877 - - $3,282
34,877
kWh
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,241
Cost:
$5,000
- - $2,241 291 -
-
kWh
$2,241
291
MMBtu
TOTAL RECOMMENDED Savings:
$41,937
Cost:
$71,558
$39,696 352,286 $2,241 291 $39,696
352,286
kWh
$2,241
291
MMBtu
TOTAL IMPLEMENTED Savings:
$32,542
Cost:
$60,038
$32,542 276,378 - - $32,542
276,378
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas