IAC Assessment: UF0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Granular Fertilizer
NAICS n/a
SIC 2875 - Fertilizers, Mixing Only
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 6,500,000
Annual Production 180,000,000 Pounds
Production Hrs. Annual 4,784
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,704 1,708,089 kWh $0.08
Natural Gas $70,276 18,033 MMBtu $3.90
TOTAL ENERGY COSTS $210,980
RECOMMENDED SAVINGS* $19,989 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,038
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,779
Cost:
$5,399
$11,779 164,127 - - $11,779
164,127
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,775
Cost:
$5,159
$1,775 24,912 - - $1,775
24,912
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,452
Cost:
$400
$2,452 11,137 - - $2,452
11,137
kWh
-
-
MMBtu
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$724
Cost:
$2,600
- - $724 187 -
-
kWh
$724
187
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$870
Cost:
$1,000
- - $870 439 -
-
kWh
$870
439
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,796
Cost:
$5,186
$1,796 23,740 - - $1,796
23,740
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$593
Cost:
$500
$593 7,327 - - $593
7,327
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$19,989
Cost:
$20,244
$18,395 231,243 $1,594 626 $18,395
231,243
kWh
$1,594
626
MMBtu
TOTAL IMPLEMENTED Savings:
$15,038
Cost:
$12,085
$14,168 195,194 $870 439 $14,168
195,194
kWh
$870
439
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas