IAC logo
IAC Assessment: UF0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Metal Connectors
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 100,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 5,005
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,450 844,959 kWh $0.07
TOTAL ENERGY COSTS $56,450
RECOMMENDED SAVINGS* $21,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,231
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$115
Cost:
-
$115 2,345 - - $115
2,345
kWh
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,692
Cost:
-
- - $8,692 - -
-
kWh
$8,692
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,673
Cost:
$5,400
$3,673 70,633 - - $3,673
70,633
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,653
Cost:
$586
$2,653 43,962 - - $2,653
43,962
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,363
Cost:
$2,828
$1,363 21,688 - - $1,363
21,688
kWh
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$379
Cost:
$666
$379 7,327 - - $379
7,327
kWh
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$952
Cost:
$1,780
$952 14,361 - - $952
14,361
kWh
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$269
Cost:
$775
$269 5,275 - - $269
5,275
kWh
-
-
$
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$200
Cost:
$280
$200 2,052 - - $200
2,052
kWh
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,475
Cost:
$1,000
$3,475 51,876 - - $3,475
51,876
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$21,771
Cost:
$13,315
$13,079 219,519 $8,692 - $13,079
219,519
kWh
$8,692
-
$
TOTAL IMPLEMENTED Savings:
$12,231
Cost:
$11,594
$12,231 204,865 - - $12,231
204,865
kWh
-
-
$