IAC logo
IAC Assessment: UF0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Paint
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 160,000
Annual Production 5,000 Thousand Gallons
Production Hrs. Annual 3,120
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,693 1,229,191 kWh $0.04
Electricity Demand $57,310 5,652 kW-months/year $10.14
TOTAL ENERGY COSTS $110,003
RECOMMENDED SAVINGS* $134,958 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,299
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,090
Cost:
$6,861
$957 22,274 $1,133 112 - - $957
22,274
kWh
$1,133
112
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,486
Cost:
$422
$899 20,809 $587 58 - - $899
20,809
kWh
$587
58
kW-months/year
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,236
Cost:
-
$1,697 39,566 $1,539 152 - - $1,697
39,566
kWh
$1,539
152
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,087
Cost:
$350
$1,087 25,205 - - - - $1,087
25,205
kWh
-
-
kW-months/year
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,400
Cost:
-
- - - - $4,400 - -
-
kWh
-
-
kW-months/year
$4,400
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$122,659
Cost:
$15,000
- - - - $122,659 - -
-
kWh
-
-
kW-months/year
$122,659
-
$
TOTAL RECOMMENDED Savings:
$134,958
Cost:
$22,633
$4,640 107,854 $3,259 322 $127,059 - $4,640
107,854
kWh
$3,259
322
kW-months/year
$127,059
-
$
TOTAL IMPLEMENTED Savings:
$12,299
Cost:
$7,633
$4,640 107,854 $3,259 322 $4,400 - $4,640
107,854
kWh
$3,259
322
kW-months/year
$4,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes