IAC logo
IAC Assessment: UF0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Packaged Fruit
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $1,000,000-$5,000,000
# of Employees 300
Plant Area (Sq.Ft.) 68,000
Annual Production 250,000 Pieces
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,439 516,999 kWh $0.07
Electricity Demand $581 1,937 kW-months/year $0.30
LPG $2,804 291 MMBtu $9.64
TOTAL ENERGY COSTS $40,824
RECOMMENDED SAVINGS* $63,083 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,730
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,729
Cost:
$8,827
$2,688 37,808 $41 144 - - - - - - $2,688
37,808
kWh
$41
144
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$1,843
Cost:
$2,500
- - - - $1,843 191 - - - - -
-
kWh
-
-
kW-months/year
$1,843
191
MMBtu
-
-
$
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,532
Cost:
$3,500
- - - - - - - - $5,532 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,532
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$39,624
Cost:
$18,550
$1,399 19,343 $25 90 - - $30,000 - $8,200 - $1,399
19,343
kWh
$25
90
kW-months/year
-
-
MMBtu
$30,000
-
$
$8,200
-
$
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,868
Cost:
$3,575
$1,825 25,791 $43 155 - - - - - - $1,825
25,791
kWh
$43
155
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$11,487
Cost:
$40,000
- - - - - - - - $11,487 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,487
-
$
TOTAL RECOMMENDED Savings:
$63,083
Cost:
$76,952
$5,912 82,942 $109 389 $1,843 191 $30,000 - $25,219 - $5,912
82,942
kWh
$109
389
kW-months/year
$1,843
191
MMBtu
$30,000
-
$
$25,219
-
$
TOTAL IMPLEMENTED Savings:
$20,730
Cost:
$49,575
$1,825 25,791 $43 155 $1,843 191 - - $17,019 - $1,825
25,791
kWh
$43
155
kW-months/year
$1,843
191
MMBtu
-
-
$
$17,019
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes