Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Pine Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 125
Plant Area (Sq.Ft.) 177,000
Annual Production 90,000 Thousand Feet
Production Hrs. Annual 4,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $535,691 14,127,785 kWh $0.04
Electricity Demand $327,906 35,959 kW-months/year $9.12
LPG $8,805 880 MMBtu $10.01
TOTAL ENERGY COSTS $872,402
RECOMMENDED SAVINGS* $145,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,270
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Administrative Changes Electricity Usage Electricity Demand Electricity Fees LPG Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$82,837
Cost:
-
- - - - $82,837 - - - - - -
-
kWh
-
-
kW-months/year
$82,837
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,078
Cost:
$10,028
$2,980 78,546 $2,098 236 - - - - - - $2,980
78,546
kWh
$2,098
236
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,923
Cost:
$4,635
$1,196 31,653 $727 80 - - - - - - $1,196
31,653
kWh
$727
80
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,234
Cost:
$116,200
$35,234 929,660 - - - - - - - - $35,234
929,660
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,019
Cost:
$1,350
$8,019 120,750 - - - - - - - - $8,019
120,750
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$2,278
Cost:
-
- - - - - - $496 50 $1,782 - -
-
kWh
-
-
kW-months/year
-
-
$
$496
50
MMBtu
$1,782
-
$
07: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$10,016
Cost:
-
- - - - - - - - $10,016 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$10,016
-
$
TOTAL RECOMMENDED Savings:
$145,385
Cost:
$132,213
$47,429 1,160,609 $2,825 316 $82,837 - $496 50 $11,798 - $47,429
1,160,609
kWh
$2,825
316
kW-months/year
$82,837
-
$
$496
50
MMBtu
$11,798
-
$
TOTAL IMPLEMENTED Savings:
$60,270
Cost:
$132,213
$47,429 1,160,609 $2,825 316 - - - - $10,016 - $47,429
1,160,609
kWh
$2,825
316
kW-months/year
-
-
$
-
-
MMBtu
$10,016
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees LPG Administrative Changes Electricity Usage Electricity Demand Electricity Fees LPG Administrative Changes