IAC Assessment: UF0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Corrugated Materials
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 300,000
Annual Production 720,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,830 5,439,625 kWh $0.05
Electricity Demand $126,987 15,176 kW-months/year $8.37
Natural Gas $145,737 57,935 MMBtu $2.52
TOTAL ENERGY COSTS $547,914
RECOMMENDED SAVINGS* $46,641 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,838
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,138
Cost:
$11,595
$2,712 59,203 $1,426 170 - - - - $2,712
59,203
kWh
$1,426
170
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,663
Cost:
$3,726
$1,739 37,808 $924 110 - - - - $1,739
37,808
kWh
$924
110
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7145 INSTALL SKYLIGHTS Savings:
$2,135
Cost:
$2,560
$2,135 52,169 - - - - - - $2,135
52,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$3,155
Cost:
$2,220
$3,155 68,875 - - - - - - $3,155
68,875
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,007
Cost:
$13,149
$2,622 57,151 $1,385 165 - - - - $2,622
57,151
kWh
$1,385
165
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,222
Cost:
$850
$4,222 60,961 - - - - - - $4,222
60,961
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,712
Cost:
$5,490
- - - - $1,712 680 - - -
-
kWh
-
-
kW-months/year
$1,712
680
MMBtu
-
-
Tgal
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$22,535
Cost:
$24,000
- - - - - - $22,535 4,293,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,535
4,293,000
Tgal
09: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,074
Cost:
$2,000
- - - - - - $2,074 758,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,074
758,000
Tgal
TOTAL RECOMMENDED Savings:
$46,641
Cost:
$65,590
$16,585 336,167 $3,735 445 $1,712 680 $24,609 5,051,000 $16,585
336,167
kWh
$3,735
445
kW-months/year
$1,712
680
MMBtu
$24,609
5,051,000
Tgal
TOTAL IMPLEMENTED Savings:
$32,838
Cost:
$39,999
$6,844 118,112 $1,385 165 - - $24,609 5,051,000 $6,844
118,112
kWh
$1,385
165
kW-months/year
-
-
MMBtu
$24,609
5,051,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal