IAC logo
IAC Assessment: UF0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Steel Joists
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 55,400
Annual Production 13,000 Tons
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,066 1,128,077 kWh $0.05
Electricity Demand $23,479 2,580 kW-months/year $9.10
Fuel Oil #2 $2,621 403 MMBtu $6.50
TOTAL ENERGY COSTS $86,846
RECOMMENDED SAVINGS* $24,568 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,492
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,918
Cost:
$5,512
$5,450 126,612 $2,468 271 - - $5,450
126,612
kWh
$2,468
271
kW-months/year
-
-
lb
02: 2.7145 INSTALL SKYLIGHTS Savings:
$2,362
Cost:
$2,560
$2,362 34,291 - - - - $2,362
34,291
kWh
-
-
kW-months/year
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$335
Cost:
$780
$239 5,569 $96 11 - - $239
5,569
kWh
$96
11
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,492
Cost:
$1,350
$3,492 50,703 - - - - $3,492
50,703
kWh
-
-
kW-months/year
-
-
lb
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,421
Cost:
$2,100
$9,421 136,577 - - - - $9,421
136,577
kWh
-
-
kW-months/year
-
-
lb
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,040
Cost:
$3,000
- - - - $1,040 116,789 -
-
kWh
-
-
kW-months/year
$1,040
116,789
lb
TOTAL RECOMMENDED Savings:
$24,568
Cost:
$15,302
$20,964 353,752 $2,564 282 $1,040 116,789 $20,964
353,752
kWh
$2,564
282
kW-months/year
$1,040
116,789
lb
TOTAL IMPLEMENTED Savings:
$3,492
Cost:
$1,350
$3,492 50,703 - - - - $3,492
50,703
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb