IAC logo
IAC Assessment: UF0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Bottling Soda Products
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 150,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 5,330
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,971 1,804,220 kWh $0.06
Electricity Demand $30,636 7,331 kW-months/year $4.18
Natural Gas $27,556 6,492 MMBtu $4.24
TOTAL ENERGY COSTS $171,354
RECOMMENDED SAVINGS* $27,847 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,998
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,316
Cost:
$7,288
$3,693 65,944 $623 149 - - - - - - $3,693
65,944
kWh
$623
149
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$491
Cost:
$6,951
$476 8,499 $15 3 - - - - - - $476
8,499
kWh
$15
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$546
Cost:
$500
$377 6,741 $169 40 - - - - - - $377
6,741
kWh
$169
40
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,132
Cost:
$1,000
$2,132 29,308 - - - - - - - - $2,132
29,308
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$8,171
Cost:
$7,500
- - - - $8,171 1,927 - - - - -
-
kWh
-
-
kW-months/year
$8,171
1,927
MMBtu
-
-
Tgal
-
-
gal
06: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$816
Cost:
$865
- - - - - - $816 741,780 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$816
741,780
Tgal
-
-
gal
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$11,375
Cost:
$7,000
- - - - - - - - $11,375 6,146 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$11,375
6,146
gal
TOTAL RECOMMENDED Savings:
$27,847
Cost:
$31,104
$6,678 110,492 $807 192 $8,171 1,927 $816 741,780 $11,375 6,146 $6,678
110,492
kWh
$807
192
kW-months/year
$8,171
1,927
MMBtu
$816
741,780
Tgal
$11,375
6,146
gal
TOTAL IMPLEMENTED Savings:
$13,998
Cost:
$14,951
$2,608 37,807 $15 3 - - - - $11,375 6,146 $2,608
37,807
kWh
$15
3
kW-months/year
-
-
MMBtu
-
-
Tgal
$11,375
6,146
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)