Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1996 |
Principal Product | Bottling Soda Products |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 5,000,000 Pieces |
Production Hrs. Annual | 5,330 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,971 | 1,804,220 | kWh | $0.06 |
Electricity Demand | $30,636 | 7,331 | kW-months/year | $4.18 |
Natural Gas | $27,556 | 6,492 | MMBtu | $4.24 |
TOTAL ENERGY COSTS | $171,354 | |||
RECOMMENDED SAVINGS* | $27,847 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,998 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,316 Cost: $7,288 |
$3,693 | 65,944 | $623 | 149 | - | - | - | - | - | - |
$3,693 65,944 kWh |
$623 149 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $491 Cost: $6,951 |
$476 | 8,499 | $15 | 3 | - | - | - | - | - | - |
$476 8,499 kWh |
$15 3 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $546 Cost: $500 |
$377 | 6,741 | $169 | 40 | - | - | - | - | - | - |
$377 6,741 kWh |
$169 40 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,132 Cost: $1,000 |
$2,132 | 29,308 | - | - | - | - | - | - | - | - |
$2,132 29,308 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $8,171 Cost: $7,500 |
- | - | - | - | $8,171 | 1,927 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,171 1,927 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $816 Cost: $865 |
- | - | - | - | - | - | $816 | 741,780 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$816 741,780 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $11,375 Cost: $7,000 |
- | - | - | - | - | - | - | - | $11,375 | 6,146 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$11,375 6,146 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,847 Cost: $31,104 |
$6,678 | 110,492 | $807 | 192 | $8,171 | 1,927 | $816 | 741,780 | $11,375 | 6,146 | $6,678 110,492 kWh |
$807 192 kW-months/year |
$8,171 1,927 MMBtu |
$816 741,780 Tgal |
$11,375 6,146 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,998 Cost: $14,951 |
$2,608 | 37,807 | $15 | 3 | - | - | - | - | $11,375 | 6,146 | $2,608 37,807 kWh |
$15 3 kW-months/year |
- - MMBtu |
- - Tgal |
$11,375 6,146 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) |