Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1997 |
Principal Product | PVC Pipe |
NAICS | n/a |
SIC | 3084 - Plastics Pipe |
Sales | $5,000,000-$10,000,000 |
# of Employees | 28 |
Plant Area (Sq.Ft.) | 34,000 |
Annual Production | 25,000,000 Pounds |
Production Hrs. Annual | 8,640 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $270,191 | 5,097,890 | kWh | $0.05 |
Electricity Demand | $17,376 | 9,505 | kW-months/year | $1.83 |
TOTAL ENERGY COSTS | $289,967 | |||
RECOMMENDED SAVINGS* | $37,597 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,450 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,676 Cost: $18,899 |
$6,333 | 119,578 | $343 | 204 | - | - | - | - | - | - |
$6,333 119,578 kWh |
$343 204 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $954 Cost: $5,432 |
$908 | 16,999 | $46 | 27 | - | - | - | - | - | - |
$908 16,999 kWh |
$46 27 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,538 Cost: $2,350 |
$11,538 | 202,521 | - | - | - | - | - | - | - | - |
$11,538 202,521 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,147 Cost: $2,000 |
- | - | - | - | $2,400 | 34,500 | - | - | $747 | - |
- - kWh |
- - kW-months/year |
$2,400 34,500 lb |
- - $ |
$747 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $15,282 Cost: - |
- | - | - | - | - | - | $15,282 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$15,282 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,597 Cost: $28,681 |
$18,779 | 339,098 | $389 | 231 | $2,400 | 34,500 | $15,282 | - | $747 | - | $18,779 339,098 kWh |
$389 231 kW-months/year |
$2,400 34,500 lb |
$15,282 - $ |
$747 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,450 Cost: $26,681 |
$18,779 | 339,098 | $389 | 231 | - | - | $15,282 | - | - | - | $18,779 339,098 kWh |
$389 231 kW-months/year |
- - lb |
$15,282 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | By-product Production |