Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1997 |
Principal Product | Corrugated Containers |
NAICS | n/a |
SIC | 2655 - Fiber Cans, Drums & Similar Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 75,000,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $206,532 | 4,284,877 | kWh | $0.05 |
Electricity Demand | $39,605 | 10,290 | kW-months/year | $3.85 |
Fuel Oil #4 | $114,815 | 28,443 | MMBtu | $4.04 |
TOTAL ENERGY COSTS | $373,452 | |||
RECOMMENDED SAVINGS* | $937,594 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7145 INSTALL SKYLIGHTS |
Savings: $3,663 Cost: $2,400 |
$3,663 | 89,390 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,663 89,390 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,225 Cost: $1,311 |
$1,137 | 27,843 | $88 | 44 | - | - | - | - | - | - | - | - | - | - |
$1,137 27,843 kWh |
$88 44 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,870 Cost: $1,050 |
$3,870 | 84,115 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,870 84,115 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,570 Cost: $625 |
- | - | - | - | $2,570 | 567 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,570 567 MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $3,600 Cost: - |
- | - | - | - | - | - | $3,600 | 60,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,600 60,000 lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,320 Cost: - |
- | - | - | - | - | - | - | - | - | - | $1,320 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$1,320 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $921,346 Cost: $1,400,000 |
- | - | - | - | - | - | - | - | $(-1,578,654) | - | - | - | $2,500,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$(-1,578,654) - $ |
- - $ |
$2,500,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $937,594 Cost: $1,405,386 |
$8,670 | 201,348 | $88 | 44 | $2,570 | 567 | $3,600 | 60,000 | $(-1,578,654) | - | $1,320 | - | $2,500,000 | - | $8,670 201,348 kWh |
$88 44 kW-months/year |
$2,570 567 MMBtu |
$3,600 60,000 lb |
$(-1,578,654) - $ |
$1,320 - $ |
$2,500,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #4 | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Increase in Production |