IAC logo
IAC Assessment: UF0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Corrugated Containers
NAICS n/a
SIC 2655 - Fiber Cans, Drums & Similar Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 125,000
Annual Production 75,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,532 4,284,877 kWh $0.05
Electricity Demand $39,605 10,290 kW-months/year $3.85
Fuel Oil #4 $114,815 28,443 MMBtu $4.04
TOTAL ENERGY COSTS $373,452
RECOMMENDED SAVINGS* $937,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
01: 2.7145 INSTALL SKYLIGHTS Savings:
$3,663
Cost:
$2,400
$3,663 89,390 - - - - - - - - - - - - $3,663
89,390
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,225
Cost:
$1,311
$1,137 27,843 $88 44 - - - - - - - - - - $1,137
27,843
kWh
$88
44
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,870
Cost:
$1,050
$3,870 84,115 - - - - - - - - - - - - $3,870
84,115
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,570
Cost:
$625
- - - - $2,570 567 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,570
567
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,600
Cost:
-
- - - - - - $3,600 60,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,600
60,000
lb
-
-
$
-
-
$
-
-
%
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,320
Cost:
-
- - - - - - - - - - $1,320 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$1,320
-
$
-
-
%
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$921,346
Cost:
$1,400,000
- - - - - - - - $(-1,578,654) - - - $2,500,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,578,654)
-
$
-
-
$
$2,500,000
-
%
TOTAL RECOMMENDED Savings:
$937,594
Cost:
$1,405,386
$8,670 201,348 $88 44 $2,570 567 $3,600 60,000 $(-1,578,654) - $1,320 - $2,500,000 - $8,670
201,348
kWh
$88
44
kW-months/year
$2,570
567
MMBtu
$3,600
60,000
lb
$(-1,578,654)
-
$
$1,320
-
$
$2,500,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Increase in Production