IAC logo
IAC Assessment: UF0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Manufactured Homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 237
Plant Area (Sq.Ft.) 130,000
Annual Production 2,750 Pieces
Production Hrs. Annual 2,700
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,469 864,302 kWh $0.05
Electricity Demand $32,374 3,475 kW-months/year $9.32
TOTAL ENERGY COSTS $240,923
RECOMMENDED SAVINGS* $211,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,578
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$346
Cost:
$3,549
$187 3,810 $159 17 - - - - - - $187
3,810
kWh
$159
17
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,088
Cost:
$1,850
$2,088 42,497 - - - - - - - - $2,088
42,497
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,663
Cost:
-
- - $1,663 179 - - - - - - -
-
kWh
$1,663
179
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$167,231
Cost:
$165,000
$(-1,911) (-38,980) $(-2,790) (-300) $(-1,142) 114,240 - - $173,074 - $(-1,911)
(-38,980)
kWh
$(-2,790)
(-300)
kW-months/year
$(-1,142)
114,240
lb
-
-
$
$173,074
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$622
Cost:
$850
- - - - - - $622 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$622
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$29,205
Cost:
-
- - - - $41,805 1,648,285 $(-12,600) - - - -
-
kWh
-
-
kW-months/year
$41,805
1,648,285
lb
$(-12,600)
-
$
-
-
$
07: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$7,964
Cost:
-
- - - - - - - - $7,964 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$7,964
-
$
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,434
Cost:
-
- - - - - - $2,434 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,434
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$211,553
Cost:
$171,249
$364 7,327 $(-968) (-104) $40,663 1,762,525 $(-9,544) - $181,038 - $364
7,327
kWh
$(-968)
(-104)
kW-months/year
$40,663
1,762,525
lb
$(-9,544)
-
$
$181,038
-
$
TOTAL IMPLEMENTED Savings:
$33,578
Cost:
$2,700
$2,088 42,497 $1,663 179 $41,805 1,648,285 $(-11,978) - - - $2,088
42,497
kWh
$1,663
179
kW-months/year
$41,805
1,648,285
lb
$(-11,978)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material