IAC logo
IAC Assessment: UF0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Doughnuts
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $1,000,000-$5,000,000
# of Employees 55
Plant Area (Sq.Ft.) 7,800
Annual Production 24,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,721 647,421 kWh $0.05
Electricity Demand $12,040 1,378 kW-months/year $8.74
Natural Gas $22,885 3,203 MMBtu $7.14
TOTAL ENERGY COSTS $72,213
RECOMMENDED SAVINGS* $11,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,145
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,139
Cost:
$2,865
$1,765 36,049 $374 43 - - - - - - - - $1,765
36,049
kWh
$374
43
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$82
Cost:
$82
$56 1,172 $26 3 - - - - - - - - $56
1,172
kWh
$26
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.5125 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE Savings:
$152
Cost:
$680
$38 879 - - $114 16 - - - - - - $38
879
kWh
-
-
kW-months/year
$114
16
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$221
Cost:
$200
$221 4,396 - - - - - - - - - - $221
4,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,415
Cost:
$4,600
$1,975 40,445 $440 50 - - - - - - - - $1,975
40,445
kWh
$440
50
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,392
Cost:
$1,300
- - - - - - $1,392 77,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,392
77,000
Tgal
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,238
Cost:
-
- - - - - - - - $(-720) - $3,958 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-720)
-
$
$3,958
-
$
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,450
Cost:
-
- - - - - - - - $1,450 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,450
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,089
Cost:
$9,727
$4,055 82,941 $840 96 $114 16 $1,392 77,000 $730 - $3,958 - $4,055
82,941
kWh
$840
96
kW-months/year
$114
16
MMBtu
$1,392
77,000
Tgal
$730
-
$
$3,958
-
$
TOTAL IMPLEMENTED Savings:
$3,145
Cost:
$1,582
$277 5,568 $26 3 - - $1,392 77,000 $1,450 - - - $277
5,568
kWh
$26
3
kW-months/year
-
-
MMBtu
$1,392
77,000
Tgal
$1,450
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost