IAC logo
IAC Assessment: UF0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Dairy Products
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 24,000
Annual Production 104,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,396 4,321,219 kWh $0.05
Electricity Demand $38,159 7,998 kW-months/year $4.77
Natural Gas $59,124 12,517 MMBtu $4.72
TOTAL ENERGY COSTS $317,679
RECOMMENDED SAVINGS* $76,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,471
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,485
Cost:
$2,869
$1,306 25,498 $179 37 - - - - $1,306
25,498
kWh
$179
37
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,376
Cost:
$11,050
$2,817 55,100 $559 116 - - - - $2,817
55,100
kWh
$559
116
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$531
Cost:
$531
$459 9,086 $72 15 - - - - $459
9,086
kWh
$72
15
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$288
Cost:
$63
- - - - $288 61 - - -
-
kWh
-
-
kW-months/year
$288
61
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$287
Cost:
$1,000
- - - - $287 61 - - -
-
kWh
-
-
kW-months/year
$287
61
MMBtu
-
-
$
06: 2.1224 REPLACE BOILER Savings:
$653
Cost:
-
- - - - $653 139 - - -
-
kWh
-
-
kW-months/year
$653
139
MMBtu
-
-
$
07: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$4,567
Cost:
$2,400
- - - - - - $4,567 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,567
-
$
08: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$32,361
Cost:
$65,000
$(-278) (-5,569) $(-121) (-25) - - $32,760 - $(-278)
(-5,569)
kWh
$(-121)
(-25)
kW-months/year
-
-
MMBtu
$32,760
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$33,242
Cost:
$113,600
$(-849) (-16,706) $(-369) (-77) - - $34,460 - $(-849)
(-16,706)
kWh
$(-369)
(-77)
kW-months/year
-
-
MMBtu
$34,460
-
$
TOTAL RECOMMENDED Savings:
$76,790
Cost:
$196,513
$3,455 67,409 $320 66 $1,228 261 $71,787 - $3,455
67,409
kWh
$320
66
kW-months/year
$1,228
261
MMBtu
$71,787
-
$
TOTAL IMPLEMENTED Savings:
$1,471
Cost:
$1,531
$459 9,086 $72 15 $940 200 - - $459
9,086
kWh
$72
15
kW-months/year
$940
200
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes