IAC logo
IAC Assessment: UF0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1998
Principal Product Envelopes
NAICS n/a
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 158
Plant Area (Sq.Ft.) 124,000
Annual Production 1,000,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $207,843 5,569,754 kWh $0.04
Electricity Demand $107,398 12,067 kW-months/year $8.90
TOTAL ENERGY COSTS $475,241
RECOMMENDED SAVINGS* $92,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,838
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,329
Cost:
$9,159
$2,160 58,324 $1,169 131 - - - - $2,160
58,324
kWh
$1,169
131
kW-months/year
-
-
lb
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$906
Cost:
-
$906 24,619 - - - - - - $906
24,619
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,351
Cost:
$749
$1,750 64,478 $601 101 - - - - $1,750
64,478
kWh
$601
101
kW-months/year
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,826
Cost:
$4,019
$1,208 32,532 $618 69 - - - - $1,208
32,532
kWh
$618
69
kW-months/year
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,216
Cost:
$2,350
$8,216 144,197 - - - - - - $8,216
144,197
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$359
Cost:
$661
$145 3,810 $214 24 - - - - $145
3,810
kWh
$214
24
kW-months/year
-
-
lb
-
-
$
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$18,876
Cost:
$14,030
$12,906 348,769 $5,970 671 - - - - $12,906
348,769
kWh
$5,970
671
kW-months/year
-
-
lb
-
-
$
08: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,260
Cost:
$1,000
- - - - - - $1,260 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,260
-
$
09: 3.7141 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM Savings:
$49,180
Cost:
-
- - - - $49,180 46,800 - - -
-
kWh
-
-
kW-months/year
$49,180
46,800
lb
-
-
$
10: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$6,029
Cost:
$15,000
- - - - - - $6,029 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,029
-
$
TOTAL RECOMMENDED Savings:
$92,332
Cost:
$46,968
$27,291 676,729 $8,572 996 $49,180 46,800 $7,289 - $27,291
676,729
kWh
$8,572
996
kW-months/year
$49,180
46,800
lb
$7,289
-
$
TOTAL IMPLEMENTED Savings:
$62,838
Cost:
$7,779
$12,225 269,636 $1,433 194 $49,180 46,800 - - $12,225
269,636
kWh
$1,433
194
kW-months/year
$49,180
46,800
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes