IAC logo
IAC Assessment: UF0196
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0196
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1998
Principal Product Particle Boards & Wood Veneers
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 116
Plant Area (Sq.Ft.) 800,000
Annual Production 14,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $379,921 6,188,160 kWh $0.06
Electricity Demand $92,568 18,514 kW-months/year $5.00
Wood $62,400 41,600 MMBtu $1.50
TOTAL ENERGY COSTS $534,889
RECOMMENDED SAVINGS* $52,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,851
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Administrative Changes Electricity Usage Electricity Demand Wood Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,043
Cost:
$6,801
$1,689 27,550 $354 71 - - - - $1,689
27,550
kWh
$354
71
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,297
Cost:
$2,257
$2,913 47,773 $384 77 - - - - $2,913
47,773
kWh
$384
77
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$586
Cost:
$155
$586 9,672 - - - - - - $586
9,672
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,682
Cost:
$2,883
$1,372 22,567 $310 62 - - - - $1,372
22,567
kWh
$310
62
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,030
Cost:
$4,425
$3,030 49,531 - - - - - - $3,030
49,531
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,256
Cost:
$1,600
$8,256 135,404 - - - - - - $8,256
135,404
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,662
Cost:
-
- - $1,662 332 - - - - -
-
kWh
$1,662
332
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,198
Cost:
$3,500
- - - - $4,198 1,679 - - -
-
kWh
-
-
kW-months/year
$4,198
1,679
MMBtu
-
-
$
09: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$6,952
Cost:
$30,000
- - - - - - $6,952 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,952
-
$
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,400
Cost:
-
- - - - - - $2,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,400
-
$
11: 4.4520 ELIMINATE SHIFT Savings:
$18,278
Cost:
-
- - - - - - $18,278 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,278
-
$
TOTAL RECOMMENDED Savings:
$52,384
Cost:
$51,621
$17,846 292,497 $2,710 542 $4,198 1,679 $27,630 - $17,846
292,497
kWh
$2,710
542
kW-months/year
$4,198
1,679
MMBtu
$27,630
-
$
TOTAL IMPLEMENTED Savings:
$16,851
Cost:
$11,320
$16,157 264,947 $694 139 - - - - $16,157
264,947
kWh
$694
139
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Administrative Changes Electricity Usage Electricity Demand Wood Administrative Changes