IAC logo
IAC Assessment: UF0212
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0212
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1998
Principal Product Manufactured homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $50,000,000-$100,000,000
# of Employees 700
Plant Area (Sq.Ft.) 285,000
Annual Production 2,500 Pieces
Production Hrs. Annual 2,772
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,103 1,563,892 kWh $0.04
Electricity Demand $69,957 8,442 kW-months/year $8.29
TOTAL ENERGY COSTS $136,060
RECOMMENDED SAVINGS* $506,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,697
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,912
Cost:
$4,901
$1,563 37,222 $1,349 163 - - $1,563
37,222
kWh
$1,349
163
kW-months/year
-
-
$
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$2,592
Cost:
$1,614
$2,592 74,443 - - - - $2,592
74,443
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,198
Cost:
$1,438
$7,198 97,011 - - - - $7,198
97,011
kWh
-
-
kW-months/year
-
-
$
04: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$1,314
Cost:
$1,818
$1,314 15,240 - - - - $1,314
15,240
kWh
-
-
kW-months/year
-
-
$
05: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$74,273
Cost:
$165,000
- - - - $74,273 - -
-
kWh
-
-
kW-months/year
$74,273
-
$
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$241,992
Cost:
$1,794
$72 25,791 - - $241,920 - $72
25,791
kWh
-
-
kW-months/year
$241,920
-
$
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$176,631
Cost:
$34,209
- - - - $176,631 - -
-
kWh
-
-
kW-months/year
$176,631
-
$
TOTAL RECOMMENDED Savings:
$506,912
Cost:
$210,774
$12,739 249,707 $1,349 163 $492,824 - $12,739
249,707
kWh
$1,349
163
kW-months/year
$492,824
-
$
TOTAL IMPLEMENTED Savings:
$85,697
Cost:
$173,157
$10,075 149,473 $1,349 163 $74,273 - $10,075
149,473
kWh
$1,349
163
kW-months/year
$74,273
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes