IAC logo
IAC Assessment: UF0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1998
Principal Product Corrugated Shipping Containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 265,000
Annual Production 54,000 Tons
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $343,570 8,878,371 kWh $0.04
Electricity Demand $28,198 18,070 kW-months/year $1.56
Natural Gas $260,248 65,734 MMBtu $3.96
TOTAL ENERGY COSTS $632,016
RECOMMENDED SAVINGS* $112,069 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,801
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,516
Cost:
$16,781
$7,189 152,989 $327 210 - - - - $7,189
152,989
kWh
$327
210
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,297
Cost:
$5,022
$4,967 127,491 $330 211 - - - - $4,967
127,491
kWh
$330
211
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,712
Cost:
$6,927
$3,481 89,390 $231 148 - - - - $3,481
89,390
kWh
$231
148
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$785
Cost:
$1,137
$733 18,757 $52 33 - - - - $733
18,757
kWh
$52
33
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,738
Cost:
$2,600
$13,138 312,720 - - - - $(-2,400) - $13,138
312,720
kWh
-
-
kW-months/year
-
-
MMBtu
$(-2,400)
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$23,988
Cost:
$2,300
- - - - $26,288 6,572 $(-2,300) - -
-
kWh
-
-
kW-months/year
$26,288
6,572
MMBtu
$(-2,300)
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,852
Cost:
$39,600
- - - - $18,852 4,713 - - -
-
kWh
-
-
kW-months/year
$18,852
4,713
MMBtu
-
-
$
08: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$18,145
Cost:
$90,000
- - - - $18,145 4,536 - - -
-
kWh
-
-
kW-months/year
$18,145
4,536
MMBtu
-
-
$
09: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,089
Cost:
$1,500
- - - - - - $1,089 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,089
-
$
10: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$21,947
Cost:
$50
- - - - - - $21,947 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,947
-
$
TOTAL RECOMMENDED Savings:
$112,069
Cost:
$165,917
$29,508 701,347 $940 602 $63,285 15,821 $18,336 - $29,508
701,347
kWh
$940
602
kW-months/year
$63,285
15,821
MMBtu
$18,336
-
$
TOTAL IMPLEMENTED Savings:
$36,801
Cost:
$24,103
$12,156 280,480 $657 421 $26,288 6,572 $(-2,300) - $12,156
280,480
kWh
$657
421
kW-months/year
$26,288
6,572
MMBtu
$(-2,300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes