IAC logo
IAC Assessment: UF0215
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1998
Principal Product Newspaper Printing and Publishing
NAICS n/a
SIC 2711 - Newspapers
Sales $50,000,000-$100,000,000
# of Employees 430
Plant Area (Sq.Ft.) 180,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,753
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $410,902 8,985,639 kWh $0.05
Electricity Demand $205,598 23,040 kW-months/year $8.92
TOTAL ENERGY COSTS $616,500
RECOMMENDED SAVINGS* $63,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,106
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,048
Cost:
$40,581
$9,150 199,004 $3,898 437 - - $9,150
199,004
kWh
$3,898
437
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,122
Cost:
$9,656
$6,122 133,060 - - - - $6,122
133,060
kWh
-
-
kW-months/year
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$551
Cost:
$5,948
$345 7,620 $206 23 - - $345
7,620
kWh
$206
23
kW-months/year
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,361
Cost:
$3,316
$4,085 88,804 $3,276 367 - - $4,085
88,804
kWh
$3,276
367
kW-months/year
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,820
Cost:
$4,000
$6,077 132,181 $4,743 532 - - $6,077
132,181
kWh
$4,743
532
kW-months/year
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,450
Cost:
-
- - - - $3,450 - -
-
kWh
-
-
kW-months/year
$3,450
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$570
Cost:
-
- - - - $570 - -
-
kWh
-
-
kW-months/year
$570
-
$
08: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$21,106
Cost:
-
- - - - $21,106 - -
-
kWh
-
-
kW-months/year
$21,106
-
$
TOTAL RECOMMENDED Savings:
$63,028
Cost:
$63,501
$25,779 560,669 $12,123 1,359 $25,126 - $25,779
560,669
kWh
$12,123
1,359
kW-months/year
$25,126
-
$
TOTAL IMPLEMENTED Savings:
$21,106
Cost:
-
- - - - $21,106 - -
-
kWh
-
-
kW-months/year
$21,106
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes