Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1999 |
Principal Product | Frozen concentrate and single strength orange and grapefruit |
NAICS | n/a |
SIC | 2087 - Flavoring Extracts And Syrups, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 4,830 Thousand Gallons |
Production Hrs. Annual | 5,040 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $106,871 | 2,016,413 | kWh | $0.05 |
Electricity Demand | $23,855 | 6,024 | kW-months/year | $3.96 |
Fuel Oil #2 | $5,184 | 590 | MMBtu | $8.79 |
Fuel Oil #6 | $122,366 | 40,880 | MMBtu | $2.99 |
TOTAL ENERGY COSTS | $258,276 | |||
RECOMMENDED SAVINGS* | $48,128 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,665 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,463 Cost: - |
- | - | $2,463 | 624 | - | - | - | - |
- - kWh |
$2,463 624 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $11,615 Cost: $50 |
- | - | - | - | $11,615 | - | - | - |
- - kWh |
- - kW-months/year |
$11,615 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $654 Cost: - |
$434 | 8,206 | $220 | 56 | - | - | - | - |
$434 8,206 kWh |
$220 56 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,583 Cost: $9,021 |
$2,065 | 38,980 | $518 | 131 | - | - | - | - |
$2,065 38,980 kWh |
$518 131 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $2,250 Cost: - |
- | - | - | - | - | - | $2,250 | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $28,563 Cost: $100,600 |
$17,654 | 333,236 | $2,409 | 608 | $8,500 | - | - | - |
$17,654 333,236 kWh |
$2,409 608 kW-months/year |
$8,500 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,128 Cost: $109,671 |
$20,153 | 380,422 | $5,610 | 1,419 | $20,115 | - | $2,250 | - | $20,153 380,422 kWh |
$5,610 1,419 kW-months/year |
$20,115 - $ |
$2,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,665 Cost: $109,671 |
$20,153 | 380,422 | $3,147 | 795 | $20,115 | - | $2,250 | - | $20,153 380,422 kWh |
$3,147 795 kW-months/year |
$20,115 - $ |
$2,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost |