IAC logo
IAC Assessment: UF0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Sulfuric acid
NAICS n/a
SIC 2874 - Phosphatic Fertilizers
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 52,000
Annual Production 930,000 Tons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $661,703 16,542,567 kWh $0.04
TOTAL ENERGY COSTS $661,703
RECOMMENDED SAVINGS* $1,902,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,570
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Primary Product Electricity Usage Administrative Changes Primary Product
$ kWh $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,848
Cost:
$2,526
$1,848 46,204 - - - - $1,848
46,204
kWh
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,327
Cost:
$91,728
$20,327 508,874 - - - - $20,327
508,874
kWh
-
-
$
-
-
$
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$122,360
Cost:
$141,700
$122,360 3,000,059 - - - - $122,360
3,000,059
kWh
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,652
Cost:
-
$1,752 43,800 $(-100) - - - $1,752
43,800
kWh
$(-100)
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,863
Cost:
$3,058
$1,863 46,584 - - - - $1,863
46,584
kWh
-
-
$
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,741,926
Cost:
$6,200,000
$(-1,019,664) 86,975 - - $2,761,590 - $(-1,019,664)
86,975
kWh
-
-
$
$2,761,590
-
$
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$12,880
Cost:
$9,000
$12,880 322,000 - - - - $12,880
322,000
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,902,856
Cost:
$6,448,012
$(-858,634) 4,054,496 $(-100) - $2,761,590 - $(-858,634)
4,054,496
kWh
$(-100)
-
$
$2,761,590
-
$
TOTAL IMPLEMENTED Savings:
$38,570
Cost:
$106,312
$38,670 967,462 $(-100) - - - $38,670
967,462
kWh
$(-100)
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Administrative Changes Primary Product Electricity Usage Administrative Changes Primary Product